The Swansea Water District is seeking sealed bidders to replace 32 micro‑filtration modules in its existing Pall “Microza®” system and to remove and dispose of the preservative used with the modules. The contract includes supply of the modules, required hardware (clamps, couplings, O‑rings, end caps, hoses), installation supervision, start‑up testing, and a ten‑year pro‑rated performance warranty. Delivery must occur within 90 days of contract award, with installation beginning within 30 days of delivery and completed no later than April 2027.
• Replace 32 micro‑filtration modules (0.1 µm pore, 10‑30 gpm per module) and dispose of glycerin preservative.
• Provide all associated hardware (Victaulic clamps, compression couplings, O‑rings, hoses, lubricants) per the Pall design drawings.
• Perform field installation, supervise for 2 days, and conduct start‑up/testing for a minimum of 2 days, delivering a 10‑year warranty.
• Meet NSF/ANSI‑61 standards, maintain required insurance coverage, and adhere to the 90‑day delivery / 30‑day installation schedule.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.