Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›PWC Mosquito Lake ADA Fishing Piers

Ohio Department of Natural Resources (ODNR)·Ohio

PWC Mosquito Lake ADA Fishing Piers

Closes 2/27/2026$200k – $500k
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Ohio Department of Natural Resources (ODNR) is seeking a contractor to fabricate, deliver, and install a modular aluminum dock system at Mosquito Lake State Park. The project involves the construction of one ADA fishing pier and a second pier if funds allow. The contractor will be responsible for securing the area, removing existing old structures and debris, and providing all labor, materials, equipment, tools, and transportation necessary to complete the work. The project includes the fabrication of modular dock sections, construction of a heavy-duty substructure, and installation of amenities such as ADA handrails and fishing benches. • The dock will consist of a 40’ x 8’ main walkway and a 40’ x 8’ fishing extension. • The contractor must ensure that all components match the dimensions specified in the provided schematic. • The contractor must provide all required galvanized hardware and bolting systems. • The contractor must transport and deliver all dock components to Mosquito Lake State Park and provide on-site installation and anchoring. • The contractor must ensure that all frames are bolted at 24" maximum centers and pinned connections for finger piers.

Attached files

Contact

Salim Fadzl(Manager)

(234) 430-6039

Key dates

Opened
1/30/2026
Closes
2/27/2026
Duration
90 days

Last updated

Details

Industry
Construction
NAICS
237910
Solicitation №
SRC0000036690

Budget estimate

$200,000 – $500,000

Based on the scope of work, the budget for this project could be in the range of $200,000 to $500,000. This estimate is influenced by the cost of materials, labor, and equipment necessary to construct the modular aluminum dock system, as well as the removal of existing old structures and debris. The fact that the project involves the construction of two piers, with the second pier being optional, also affects the estimated budget range. Additionally, the requirement for the contractor to provide all necessary hardware and bolting systems, as well as the need for on-site installation and anchoring, contributes to the estimated cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Daytona Beach·Florida

Top match · 61%

2702RFQ - Daytona Beach Replacement Pier Consultant

Closes 11/5/2026Opened 10/8/2026

Lafourche Parish Government·Louisiana

61% match

CATFISH LAKE LIVING SHORELINE PROTECTION – PHASE 1 GOLDEN MEADOW, LAFOURCHE PARISH, LOUISIANA

Closes 12/3/2026Opened 10/28/2026

U.S. DOC NOAA - ERA Production·United States of America

61% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

U.S. Fish and Wildlife Service·United States of America

61% match

F26AS00105 National Fish Passage Program

Closes 4/30/2027Opened 8/24/2026

Palm Beach County (Board of County Commissioners)·Florida

60% match

PBC North County Shore Protection

Closes 11/18/2026Opened 10/19/2026

County of Riverside·California

59% match

LIVE CHANNEL CATFISH STOCKING

Closes 11/12/2026Opened 10/29/2026

U.S. Fish and Wildlife Service·United States of America

59% match

F26AS00069 Coastal Program FY26

Rolling / TBD closeOpened 5/19/2026

U.S. Fish and Wildlife Service·United States of America

59% match

F26AS00062: Great Lakes Fish and Wildlife Restoration Act FY 2026

Rolling / TBD closeOpened 6/1/2026

U.S. Department Of Defense·South Dakota

59% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

Douglas County·Nebraska

59% match

Levi Carter Park Fishing Pier Improvements

Closes 11/4/2026Opened 10/21/2026

Palm Beach County Board of County Commissioners·Florida

59% match

PBC North County Shore Protection

Closes 11/18/2026Opened 10/21/2026

City of Phoenix·Arizona

59% match

Lake and Waterway Management Services

Closes 11/13/2026Opened 10/20/2026

Illinois Natural Resources·Illinois

59% match

Invasive Carp Management Control in IL Waterway GLRI (FY26)

Rolling / TBD closeOpened 12/21/2025

Illinois Natural Resources·Illinois

58% match

Invasive Carp Management Control in IL Waterway GLRI (CAFWS-183)

Rolling / TBD closeOpened 1/1/2026

U.S. Department Of Defense·Kentucky

58% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Lake County·California

58% match

Abatement of Dilapidated Lakebed Structures #01

Closes 11/6/2026Opened 10/22/2026

City of Pembroke Pines·Florida

58% match

Aquatic Management - Pembroke Lakes Golf Course

Closes 11/9/2026Opened 10/19/2026

Illinois DNR - Natural Resources·Illinois

58% match

Sunfish for Statewide Urban Fishing Program

Closes 11/4/2026Opened 10/14/2026

Santa Clara Valley Water District·California

58% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

City of Hutchinson·Minnesota

58% match

Hutchinson, City of South Fork Crow River Sediment Forebay BMI No. 0W1.123849

Closes 12/1/2026Opened 10/29/2026

Illinois Natural Resources·Illinois

58% match

DJ - Sport Fish Restoration - Fisheries, Boat Access (FY25)

Rolling / TBD closeOpened 1/1/2024

Alaska Department of Fish and Game·Alaska

58% match

Copper River/Prince William Sound Fish & Game Advisory Committee Meeting

Rolling / TBD closeOpened 9/22/2026

City & Borough of Juneau·Alaska

58% match

Aurora Harbor Drive Down Float

Closes 11/10/2026Opened 9/22/2026

City of Lake Charles·Louisiana

58% match

Riverside Park Shoreline Protection – Phase One

Closes 11/17/2026Opened 10/22/2026

U.S. Department Of Defense·Kansas

58% match

Law Enforcement Services for Elk City Lake, Montgomery County, Kansas

Closes 11/16/2026Opened 10/30/2026