Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›OMH Creedmoor Psychiatric Center Building 40 Automatic…

Dormitory Authority of the State of New York·New York

OMH Creedmoor Psychiatric Center Building 40 Automatic Transfer Switch Replacement (EOI)

Closes 9/17/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLYSee the Eligibility Requirements further down in this document. The project consists of, but is not limited to, the removal and replacement of the existing Automatic Transfer Switch in Building 40, including associated electrical connections, wiring, testing, commissioning, and all required incidental work to provide a complete and fully operational system. Estimated Cost Range for Scope of Work: $600,000 - $650,000. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. Please find links to the specifications and drawings below:Creedmoor PC - Project ManualCreedmoor PC - DrawingsGeneral Conditions for Construction dated February 4, 2026, will apply to the Contract Documents.The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows:Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45%Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6%Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid.Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to [email protected]. Instructions for Submission of the EOI Packages:Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with:A Cover Page that clearly identifies:The Legal Name of the Company submitting the EOIThe Project Name for which the EOI is being submittedThe Date of Submission Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company ProfileProvide a company profile that includes the following information: Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. Date Established – When the company was founded. Company Address – Primary business location. Ownership Information – Name and resumes of all principal owners. Client List – Summary of public and private sector clients. Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. Equipment - Overview of all equipment owned by the company. Self-Performed Services - Description of all services the company performs directly (not subcontracted). MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certifications (if applicable). Tab 2 – ExperienceProvide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: Name of the project designerFirm name and contact informationProject title and location/facilityBrief description of the projectTotal construction costConstruction start dateSubstantial completion dateIndicate role as prime contractor or subcontractorPercentage of the work that was self-performed If applicable, also include a list of all DASNY projects completed within the last 5 years. Tab 3 – Project SchedulesProvide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project. Tab 4 – Safety ProgramProvide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety.Tab 5 – RésumésProvide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative.Tab 6 – Potential SubcontractorsProvide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work.Tab 7 – Anticipated WorkloadProvide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe. Tab 8 – Experience Modification RatingProvide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation. Tab 9 – Bonding CapacityProvide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements. Tab 10 – NYS Vendor Responsibility QuestionnaireProvide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy. Eligibility/Qualifications Requirements/Preferences: Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY. Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and [email protected]. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
8/20/2026
Closes
9/17/2026

Last updated

Details

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The University of Iowa·Iowa

Top match · 69%

UI Health Care - John W. Colloton Pavilion - LL - Replace MRI in Room 0457 ID075

Closes 11/10/2026Opened 10/21/2026

NYS OGS Design & Construction - Construction Contractors·New York

67% match

45298 HVAC – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

State of Delaware OMB·Delaware

66% match

Morris Community Correction Center Generator & ATS Replacement

Closes 12/1/2026Opened 9/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

66% match

45298 PLUMBING – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

66% match

45298 ELECTRICAL – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

West Virginia Lottery·West Virginia

66% match

EOI - A/E Services Lottery HVAC System Replacement Project

Closes 12/1/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

Replace Nurse Call System

Closes 11/18/2026Opened 10/7/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

Replace Electrical Panels – MacCormick Secure Center

Closes 11/18/2026Opened 10/13/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

45298 CONSTRUCTION – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

LA County Public Works·California

65% match

BRC0000667 - On-Call Commercial and Institutional Recycling Program

Closes 11/10/2026Opened 10/5/2026

Corrections and Community Supervision, NYS Dept. of·New York

65% match

Energy Recovery Unit Repair & Controls Replacement

Closes 12/10/2026Opened 10/8/2026

Long Beach Unified School District·California

65% match

2627-006 RFP MDF/IDF Switch Replacement Project (E-Rate Funding Year 2027)

Closes 11/13/2026Opened 10/2/2026

Mental Health, NYS Office of·New York

65% match

OMH01-OP202877-3650323 Drain replacement at Elmira PC

Closes 11/6/2026Opened 10/23/2026

Nevada State Public Works Division·Nevada

64% match

Building 8 Exiting Upgrade (Northern Nevada Adult Mental Health Services) (25-M02-12)

Closes 12/1/2026Opened 10/29/2026

State of Michigan – Department of Technology, Management and Budget (Design and Construction Division)·Michigan

64% match

472/25278.RWG; Ionia C.F. - IT Room Expansion

Closes 11/18/2026Opened 10/22/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

Replace Nurse Call System – Project 47905‑E

Closes 11/18/2026Opened 10/7/2026

Department of Behavioral Health and Developmental Services·Virginia

64% match

NVMHI Replacement of Six (6) Air Handling Units

Closes 11/3/2026Opened 10/1/2026

Massachusetts Department of Mental Health·Massachusetts

64% match

Reprocurement of Adult Community Clinical Services (ACCS) Request for Information

Closes 11/30/2026Opened 9/24/2026

Spring ISD·Texas

64% match

Network Switch Refresh II

Closes 11/13/2026Opened 10/2/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

46151 E – Provide Switchgear & Control System Modification

Closes 11/4/2026Opened 9/23/2026

U.S. Department Of Veterans Affairs·Kentucky

64% match

C1DA-- AE Replace Elevators 539-24-102

Closes 11/2/2026Opened 10/16/2026

City of Clermont·Florida

64% match

Well House Generator Transfer Switch Improvements

Closes 11/12/2026Opened 10/16/2026

U.S. Department Of Veterans Affairs·Illinois

64% match

J041--Condenser Coils Replacement for the VA Illiana Health Care System (VAIHCS), located at 1900 E. Main Street, Danville, IL 61832.

Closes 11/4/2026Opened 10/15/2026

City of Cedar Rapids·Iowa

64% match

2nd Street SE Relocation of Interior Vault Utilities

Closes 11/18/2026Opened 10/21/2026

Collin County Community College District·Texas

64% match

McKinney Main Building Switchboard Replacement

Closes 11/6/2026Opened 10/16/2026