Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Construction
  5. ›TOWN OF AINSWORTH - PICKEREL LAKE ROAD STORM STRUCTURE…

Town of Ainswroth·Wisconsin

TOWN OF AINSWORTH - PICKEREL LAKE ROAD STORM STRUCTURE REPLACEMENT

Closes 4/23/2026$200k – $300kInvitation for BidLogin requiredFee to access
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Ainswroth is seeking a contractor to replace a stormwater structure on Pickerel Lake Road. The work includes demolition of the existing structure, installation of a new 48‑foot aluminum pipe arch with headwalls and wingwalls, and reconstruction of approximately 175 linear feet of town road. The project also requires site preparation, backfill, aggregate base, new asphalt pavement, traffic control, riprap, geotextile fabric, and restoration of salvaged topsoil. A 5 % bid bond is required, and the project must be completed within roughly 35 calendar days, with a final completion deadline of October 1, 2026 at the latest. • 175 LF of road reconstruction and stormwater structure replacement • Removal of existing structure and installation of a 48 LF aluminum pipe arch (15‑ft‑4‑in × 10 ft) with headwalls/wingwalls • Required bid bond (5 % of bid), mandatory compliance with local wage rates, and tight schedule (≈ 35 days)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Gregg Borucki(Solicitor)

[email protected]

(608) 355-8959

Key dates

Opened
4/3/2026
Closes
4/23/2026
Duration
35 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Quest Number: 10104473

Budget estimate

$200,000 – $300,000

Based on the scope—175 LF of road reconstruction, demolition and replacement of a stormwater structure, installation of a 48‑ft aluminum pipe arch, and associated site work—the contract is likely in the low‑hundreds‑of‑thousands range. Assuming an average cost of $1,200‑$1,800 per linear foot for road work plus $150,000‑$200,000 for the specialized pipe arch and ancillary items, a reasonable estimate is roughly $200,000 to $300,000. Factors influencing the final amount include material prices for the aluminum arch, subcontractor rates, and any unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lake Oswego·Oregon

Top match · 69%

Ash Street and Lund Street – Storm System Improvements Project

Closes 11/5/2026Opened 9/29/2026

City of Charlotte·North Carolina

68% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Charlotte·North Carolina

66% match

Wood Dale Ter 2022 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/23/2026

City of Hesperia·California

66% match

2025 DECEMBER ADVERSE WEATHER EMERGENCY REPAIRS: CEDAR STREET AND BANDICOOT TRAIL

Closes 11/12/2026Opened 9/23/2026

Town of Haymarket·Virginia

66% match

Town Center Exterior Site Work RFP 2026-003

Closes 12/7/2026Opened 9/30/2026

City of Easley·South Carolina

66% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

City of Charlotte·North Carolina

65% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

65% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

Town of Munster·Indiana

65% match

RFQ Tornado and Water Damage Restoration and Reconstruction

Closes 11/11/2026Opened 10/29/2026

City of Charlotte·North Carolina

65% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

Nevada Government·Nevada

65% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Lake City and City of Bellechester·Minnesota

65% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

City of Prior Lake·Minnesota

65% match

Lord's Street Bridge Rehabilitation Project

Closes 11/18/2026Opened 10/29/2026

City of Charlotte·North Carolina

65% match

North Hoskins Rd 601 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

65% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

Union Parish School Board·Louisiana

65% match

UNION PARISH HIGH SCHOOL 2026 WINTER STORM DAMAGE REPAIRS

Closes 11/10/2026Opened 10/8/2026

Massachusetts Town of Barre·Massachusetts

65% match

FY27-06 Cutler Road Reconstruction

Closes 11/5/2026Opened 10/22/2026

City of Charlotte·North Carolina

65% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of Charlotte·North Carolina

65% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Douglas WY·Wyoming

65% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

City of Charlotte·North Carolina

64% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

City of Hopewell·Virginia

64% match

On-Call Emergency Snow and Ice Removal Services

Closes 11/19/2026Opened 10/29/2026

City of Charlotte·North Carolina

64% match

Foxrun/Burtonwood Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/29/2028

NYS Oswego County·New York

64% match

E-911 Heat Pump and Roof Top Unit (RTU) Replacement

Closes 11/17/2026Opened 10/30/2026