Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Idaho guideIdaho Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Idaho
  4. ›Construction
  5. ›Ann Morrison Park Surface Water Pumping Station

City of Boise·Idaho

Ann Morrison Park Surface Water Pumping Station

Closes 8/26/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Boise is seeking a qualified contractor to design, construct, and install a new surface‑water pumping station at Ann Morrison Park, including all civil, mechanical, electrical, and irrigation components required for a fully operational pump system. The contract is awarded via a formal sealed‑bid process; a 5 % bid security is required, and all work must be completed within the designated seasonal window (October 15 2026 – April 15 2027). The scope covers pump procurement, wet‑well construction, check structure, intake screens, pressure control, electrical panels, conduit, and post‑construction landscape restoration (excluding riparian damage). The project is funded by the City of Boise and will be managed under its Parks & Recreation department. • Construct and install a 75 HP vertical turbine pump station with 1,000 GPM capacity and associated wet‑well, check structures, and intake screens. • Provide all civil works (excavation, concrete pads, road/traffic control) and mechanical piping (ductile‑iron, PVC, HDPE) to meet design specifications. • Install complete electrical system (panels, VFDs, conduit, arc‑flash safety compliance) and integrate with existing irrigation infrastructure. • Perform testing, start‑up, commissioning, and deliver as‑built drawings; include a two‑year warranty on workmanship and a 5 % bid bond.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Megan Harvey(Primary Procurement Contact)

[email protected]

(208) 972-8190

Key dates

Opened
8/7/2026
Closes
8/26/2026
Duration
6 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
FB-2026-082

Budget estimate

$2,000,000 – $5,000,000

Based on comparable municipal pump‑station projects of similar size (75 HP, 1,000 GPM) and the extensive civil, mechanical, and electrical scope, the total contract value is typically in the low‑to‑mid‑million‑dollar range. Assuming a base construction cost of roughly $1.5 M for civil works, $600 K for mechanical equipment, $500 K for electrical installation, and $400 K for ancillary items (landscape restoration, testing, warranties), the overall budget would likely fall between $2 M and $5 M. Factors influencing the final amount include material price fluctuations, site‑specific conditions, and any additional subcontractor work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.P. Engineers & Architects, Inc·Michigan

Top match · 64%

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

Gwinnett County Government·Georgia

63% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of San Diego·California

63% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Stillwater·Oklahoma

63% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

City of Aurora, OH·Ohio

62% match

Aurora Park Utility Improvements - ReBid

Closes 11/5/2026Opened 10/9/2026

Dickenson County·Virginia

62% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Gwinnett County Government·Georgia

62% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

U.S. Department Of Agriculture·Oregon

62% match

Toilet Pumping for Powers & Gold Beach Ranger District

Closes 11/9/2026Opened 10/22/2026

Upper Occoquan Service Authority·Virginia

62% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Connecticut Town of South Windsor·Connecticut

62% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

City of Fresno·California

62% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

City of Waynesboro·Virginia

62% match

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

City of Key West·Florida

61% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

61% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Massachusetts Town of Nantucket·Massachusetts

61% match

IFB - Well No. 17 Pump Station Project

Closes 12/9/2026Opened 10/28/2026

Northern Virginia Parks·Virginia

61% match

Brambleton Golf Course - Replacement of Irrigation Pumping Plant

Closes 11/9/2026Opened 10/9/2026

Oregon Parks and Recreation Department·Oregon

61% match

14546 Jessie M. Honeyman SP Water Intake Replacement (Construction)

Closes 11/2/2026Opened 10/7/2026

Massachusetts Town of Marion·Massachusetts

61% match

Creek Road Pump Station Resiliency Improvements

Closes 12/2/2026Opened 10/21/2026

Jackson County Utility Authority·Mississippi

61% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

Gwinnett County Government·Georgia

61% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of Billings·Montana

61% match

Evergreen Park Irrigation System Replacement

Closes 11/4/2026Opened 10/8/2026

Town of Eatonville·Florida

60% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Hickman, Nebraska·Nebraska

60% match

Hickman NE Reservoir and Pump Station

Closes 11/9/2026Opened 10/9/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

60% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Town of Babylon·New York

60% match

BID# 26G53 - CONSTRUCTION OF AUXILIARY PUMP & PUMP STATION AT CELL 7

Closes 11/5/2026Opened 10/21/2026