Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Drainage Basin Installation, Mansfield Hollow Dam…

U.S. Department Of Defense·Massachusetts

Drainage Basin Installation, Mansfield Hollow Dam, Mansfield, CT

Closes 6/18/2026$25k – $100kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers is seeking a contractor to install a new drainage basin at the Mansfield Hollow Dam in Mansfield, CT. The work includes excavation, installation of a geotextile membrane, a gravel base layer, and a layer of rip rap stone. The contractor must ensure that all work is done in accordance with applicable industry standards and federal, state, and local laws. The project requires a site-specific Accident Prevention Plan, and the contractor must comply with all safety and health requirements. The period of performance is 180 days, and the contractor must complete all work during this time. • The contractor must provide all materials, equipment, and labor for the project. • The contractor must ensure that all work is done in accordance with applicable industry standards and federal, state, and local laws. • The contractor must comply with all safety and health requirements, including the preparation of a site-specific Accident Prevention Plan. • The contractor must complete all work within the 180-day period of performance. • The contractor must provide a telephone number and point of contact for discussion of contractual matters.

Attached files

Contact

Jennifer Samela(Contracting Officer or Representative)

[email protected]

(978) 318-8324

Key dates

Opened
5/19/2026
Closes
6/18/2026
Duration
180 days

Last updated

Details

Type
Request for Quotation
Industry
Civil Engineering
NAICS
237990
Solicitation №
W912WJ26QA113

Budget estimate

$25,000 – $100,000

The estimated cost of the work is between $25,000 and $100,000. Based on this information, it is likely that the budget for this project will be in the same range. The final budget will depend on the contractor's bid and the actual costs incurred during the project. The budget may be influenced by factors such as the complexity of the work, the materials and equipment required, and the labor costs. However, without more detailed information about the project, it is difficult to provide a more precise estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Connecticut

Top match · 73%

Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT

Closes 11/5/2026Opened 10/13/2026

Town of Manchester·Connecticut

71% match

FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY

Closes 11/17/2026Opened 10/20/2026

Connecticut Cromwell Fire District·Connecticut

68% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

Gwinnett County Government·Georgia

68% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Connecticut Cromwell Fire District·Connecticut

68% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

Miami-Dade County·Florida

68% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 11/6/2025

Town of Bennington·Vermont

67% match

TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559

Closes 11/19/2026Opened 10/6/2026

City of Farmington·New Mexico

67% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

City of Easley·South Carolina

67% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

City of Charlotte·North Carolina

67% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

Connecticut Metropolitan District Commission·Connecticut

66% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Town of Manchester·Connecticut

66% match

ENGINEERING SERVICES - DRY BROOK CULVERT REPLACEMENT

Closes 11/10/2026Opened 10/13/2026

City of Charlotte·North Carolina

66% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

66% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

City of Mansfield·Texas

66% match

Westside Sanitary Sewer Interceptor Project 1

Closes 11/18/2026Opened 10/21/2026

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Massachusetts Department of Environmental Protection·Massachusetts

66% match

DEP-BWR-NOI-FY27-Ipswich Basin PFAS GrantANNOUNCEMENT ONLY

Closes 11/6/2026Opened 10/6/2026

Ohio Department of Natural Resources·Ohio

65% match

Lake Logan Dam Improvements

Closes 11/6/2026Opened 10/16/2026

Ohio Department of Natural Resources·Ohio

65% match

Cowan Lake Dam Improvements

Closes 11/6/2026Opened 10/2/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

65% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Massachusetts Town of Barnstable·Massachusetts

65% match

LEGAL AD ONLY: FY27 ROAD DRAINAGE IMPROVEMENTS https://townofbarntable.bonfirehub.com

Closes 11/4/2026Opened 10/6/2026

City of Litchfield·Illinois

65% match

Water Distribution Improvements Phases 1 & 2 - Litchfield, IL

Closes 11/5/2026Opened 10/2/2026

City of Brandon·Mississippi

65% match

BROOKSTONE PLACE DRAINAGE IMPROVEMENTS

Closes 11/20/2026Opened 10/21/2026

Town of Cutler Bay·Florida

65% match

Old Cutler Commons UN1 & UN2 Sub-Basins Water Quality Improvement Project

Closes 1/13/2027Opened 10/23/2026

U.S. Department Of The Interior·Utah

65% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026