Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›USBR Patillas Dam Seismic Retrofit Design Update and…

U.S. Department Of Defense·Puerto Rico

USBR Patillas Dam Seismic Retrofit Design Update and Industry Outreach

Closes 8/7/2026$10M – $50MRequest for Expression of Interest
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Bureau of Reclamation (USBR) is hosting an industry outreach event to engage with industry partners for the Patillas Dam Seismic Retrofit Project. The event will include a project presentation, industry input session, and a guided site visit to the Patillas Dam. The project involves seismic retrofit measures, outlet works reconstruction, and complex construction sequencing. Interested companies are encouraged to RSVP and attend the event to learn more about the project's technical requirements and prepare for future acquisition planning. • The event will take place on June 11-12, 2026, at the USACE Caribbean District offices in San Juan, Puerto Rico. • The project is currently in the final design phase. • The USBR is seeking to engage with engineering firms, contractors, and technical specialists. • The event will include a vendor collaboration and meet-and-greet session. • Virtual one-on-one sessions will be available after the site visit.

Attached files

Contact

Angel J. Martinez

[email protected]

(939) 348-9503

Key dates

Opened
5/20/2026
Pre-bid meeting
6/11/2026
Site visit
6/12/2026
Closes
8/7/2026

Last updated

Details

Type
Request for Expression of Interest
Industry
Construction
NAICS
237990
Solicitation №
W51DQV26Z1BJA

Budget estimate

$10,000,000 – $50,000,000

The budget for this project is difficult to estimate, as the document does not provide a specific budget or contract value. However, based on the scope of the project, which includes seismic retrofit measures, outlet works reconstruction, and complex construction sequencing, the budget could be in the range of $10 million to $50 million. This estimate is rough and based on the assumption that the project will require significant construction and engineering services.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Washington DC Energy and Environment (DOEE)·District of Columbia

Top match · 67%

FY26 Parkland Stormwater Retrofits - DPR V

Closes 11/24/2026Opened 10/22/2026

California Grants·California

67% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

LAUSD·California

66% match

DESIGN BUILD | RFQ # R-27016 - 107TH STREET ELEMENTARY | SEISMIC MODERNIZATION PROJECT

Closes 12/21/2026Opened 10/16/2026

U.S. Department Of Defense·Oregon

66% match

John Day Dam Powerhouse HVAC Upgrades

Closes 12/31/2026Opened 4/1/2026

U.S. Department Of Agriculture·Utah

66% match

GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest

Closes 11/20/2026Opened 10/5/2026

U.S. Department Of Defense·Oklahoma

65% match

Webbers Falls Excitation System Replacements

Closes 11/5/2026Opened 10/9/2026

Massachusetts Town of Bolton·Massachusetts

65% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

City of Farmington·New Mexico

65% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

North Carolina City of Raleigh·North Carolina

65% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

Washington Enterprise Services (DES), Dept. of·Washington

65% match

CBC - Saraceno Way Update

Closes 11/18/2026Opened 10/21/2026

U.S. Engineer Research and Development Center·United States of America

65% match

ERDC Broad Agency Announcement

Rolling / TBD closeOpened 1/2/2026

The City of Columbus·Ohio

65% match

RFQ033855 - Hoover Dam Improvements Pt. 2

Closes 12/9/2026Opened 10/16/2026

City of Columbus·Ohio

65% match

Hoover Dam Improvements Pt. 2

Closes 11/18/2026Opened 10/13/2026

Town of Arlington·Massachusetts

65% match

Oil Hydraulic Elevator Improvements - Police Headquarters

Closes 11/3/2026Opened 9/17/2026

U.S. Postal Service·Colorado

65% match

Denver, CO Denver P&DC Roof Replacement K95856

Closes 11/20/2026Opened 10/19/2026

City of South Lake Tahoe·California

65% match

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

UCLA Capital Programs·California

65% match

Gayley Center Real Time Safety Center (PREQUALIFICATION)

Closes 11/12/2026Opened 10/22/2026

City of Plano·Texas

64% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

City of Plano·Texas

64% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

Ohio Department of Natural Resources·Ohio

64% match

Lake Logan Dam Improvements

Closes 11/6/2026Opened 10/16/2026

City of Columbus Ohio·Ohio

64% match

Hoover Dam Improvements – Part 2

Closes 12/9/2026Opened 10/14/2026

U.S. Department Of Defense·Washington

64% match

USCG Station at Cape Disappointment

Closes 11/15/2026Opened 10/23/2026

West Basin Municipal Water·California

64% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

City of Seattle·Washington

64% match

Outreach Event: Cascades Dam Tour

Closes 2/26/2027Opened 9/30/2026

U.S. Economic Development Administration·United States of America

64% match

EDA FY25 Disaster Supplemental

Closes 10/31/2026Opened 6/4/2025