Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Civil Engineering
  5. ›Dillon Dam Recpath Engineered Design

Summit County·Colorado

Dillon Dam Recpath Engineered Design

Closes 9/30/2026$500k – $1.2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County seeks a qualified engineering firm to develop full design documents for a ~4,800‑ft recreational pathway along Dillon Dam, including conceptual alternatives, 60% and 90% design phases, and final construction‑ready drawings, while coordinating with FERC, Denver Water Dam Safety, and other regulatory agencies. The work will span from October 2026 through September 2027 and requires a Colorado‑licensed PE and extensive dam‑related regulatory experience. • Design of 4,800 ft of existing pathway to meet modern road & bridge standards and AASHTO bicycle guidelines. • Three‑phase deliverables: 60% design, 90% design, and Issued‑for‑Construction package with all specifications and cost estimates. • Mandatory coordination with Federal Energy Regulatory Commission, Denver Water, and state water resources agencies; includes survey/geotechnical scope identification. • Requires monthly progress reporting, agency liaison, and compliance with Summit County insurance and indemnification requirements. • Proposal submission by 30 Sept 2026; award expected 12 Oct 2026, with design work commencing Oct 2026.

Attached files

Contact

Jordan Mead(Resource Specialist, Open Space and Trails Department)

[email protected]

(970) 668-4065

Key dates

Opened
4/9/2026
Questions due
9/18/2026
Pre-bid meeting
9/15/2026
Site visit
9/15/2026
Closes
9/30/2026
Projected award
10/12/2026
Duration
11 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330

Budget estimate

$500,000 – $1,200,000

No budget is disclosed, but comparable civil‑engineering design contracts for a 4,800 ft walkway with extensive regulatory coordination typically range from $500 K to $1.2 M. The lower bound assumes a basic design package; the upper bound reflects full 60%/90%/IFC deliverables, extensive surveys, and premium engineering rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Kentucky

Top match · 64%

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

North Central Missouri Regional Water Commission·Missouri

63% match

REBID NCMRWC Roy Blunt Multi-Purpose Reservoir

Closes 11/5/2026Opened 10/15/2026

Maryland Department of Transportation·Maryland

62% match

MD 249 (Piney Point Road) from Thomas Road to Stark Drive -Drainage Improvements -Design-Build

Closes 11/17/2026Opened 9/29/2026

Laramie Rivers Conservation District·Wyoming

62% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

U.S. Department Of Transportation·North Dakota

62% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

City of Farmington·New Mexico

62% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

City of El Paso De Robles·California

61% match

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

61% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

Ramsey County·Minnesota

61% match

Vadnais Boulevard Professional Design Services

Closes 11/12/2026Opened 10/19/2026

Town of Topsham·Maine

61% match

RFP for Engineering Services - Design of Canam Drive, Topsham

Closes 11/13/2026Opened 9/21/2026

U.S. Department Of The Interior·California

61% match

FWS - Pixley NWR Water Recirculation Design-Build

Closes 11/30/2026Opened 10/30/2026

Georgia Cobb County Department of Transportation·Georgia

61% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

City of Fargo·North Dakota

61% match

City of Fargo RFP - Engineering Services: Project No. SR-28-A0 Project No. SN-28-A0 Project No. SN-29-A0

Closes 11/13/2026Opened 10/17/2026

Washington DC Energy and Environment (DOEE)·District of Columbia

61% match

FY26 Parkland Stormwater Retrofits - DPR V

Closes 11/24/2026Opened 10/22/2026

City of San Diego·California

61% match

Murray Dam Near Term Repairs - Advertisement Notice Only (no bids)

Closes 12/1/2026Opened 10/6/2026

New Mexico State University·New Mexico

60% match

5426 Gadsden Campus Entrance Road

Closes 11/17/2026Opened 10/9/2026

Roanoke City Government·Virginia

60% match

RFP # SOL1369, Engineering Design Services for Cove/Peters Creek Pedestrian Improvements

Closes 12/3/2026Opened 10/26/2026

Gwinnett County Government·Georgia

60% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Covington Municipality·Rhode Island

60% match

088-26-GREEN INFRASTUCTURE STORMWATER PROJECT DESIGN

Closes 11/2/2026Opened 11/2/2026

City of Farmington·New Mexico

60% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

State of Michigan – Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division·Michigan

60% match

751/26612.MAA; Various Dams - Engineering Studies

Closes 12/3/2026Opened 10/22/2026

U.S. Department Of Transportation·Colorado

60% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

North Carolina City of Raleigh·North Carolina

60% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

Georgia Cobb County Department of Transportation·Georgia

60% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

City of Farmers Branch·Texas

60% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026