Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›Great Rivers Greenway District – Mississippi Greenway…

Great Rivers Greenway·Missouri

Great Rivers Greenway District – Mississippi Greenway: Maline Creek Streambank Stabilization & Trail Reconstruction (GRG Bid# 2026-005-108X)

Closes 6/5/2026$1.8M – $3.2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks a qualified contractor to stabilize a 120‑ft stretch of the Maline Creek streambank and reconstruct the adjacent Mississippi Greenway trail in St. Louis City, MO. The work includes earthwork, heavy‑stone revetment, mechanically stabilized earth (MSE) retaining walls, concrete block walls, cable fencing, asphalt repair (or an alternate concrete trail), and full coordination with BNSF Railroad and multiple permitting agencies. The contractor must provide all labor, materials, equipment, and supervision, comply with prevailing‑wage rules, and meet a tight construction schedule (approximately 180 days total). • Streambank stabilization using MSD 8 limestone revetment blocks, geotextile, and drainage pipe. • Trail reconstruction (asphalt resurfacing or optional 4‑in. reinforced concrete). • Installation of safety fencing, erosion‑control silt socks, and temporary traffic control. • Coordination with BNSF Railroad for ROW work, utility verification, and permit compliance. • Required 5 % bid security, bid bond (cashier’s check), and adherence to detailed JSP specifications.

Attached files

Contact

Ben Grossman(Vice President – Greenway Operations)

[email protected]

(314) 436-7009

Key dates

Opened
4/28/2026
Questions due
5/19/2026
Pre-bid meeting
5/12/2026
Closes
6/5/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
GRG Bid# 2026-005-108X

Budget estimate

$1,800,000 – $3,200,000

The solicitation’s base‑bid line item for BNSF permitting allowance is $90,000, but the full bill of quantities (stone revetment, MSE walls, trail work, traffic control, etc.) suggests a contract in the low‑to‑mid‑million range. Assuming average unit costs for heavy limestone block revetment (~$150‑$200 per CY), MSE wall construction (~$120 per SY), and trail resurfacing (~$5‑$6 per SY), the total contract value is likely between $1.8 M and $3.2 M. Local labor rates, prevailing‑wage requirements, and the 5 % bid security also influence the final amount.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Great Rivers Greenway·Missouri

Top match · 78%

GRG 2026-009-725I - Missouri Greenway: Monarch Chesterfield Levee Trail Signage Replacement Project

Closes 11/6/2026Opened 10/12/2026

City of Fitchburg·Wisconsin

76% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

Mississippi Department of Finance and Administration·Mississippi

76% match

MMNS Trail Repairs – LeFleur's Bluff State Park (Bid #610‑015)

Closes 11/17/2026Opened 10/15/2026

Mississippi Department of Finance and Administration·Mississippi

76% match

MMNS Trail Repairs (GS# 610-015)

Closes 11/17/2026Opened 10/15/2026

Kenosha County·Wisconsin

76% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Madison·Wisconsin

75% match

SAUK CREEK GREENWAY

Closes 1/28/2027Opened 1/28/2027

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

75% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

North Carolina County of Mecklenburg·North Carolina

74% match

Kings Branch at Arrowood Road Phase 2B Stream Restoration

Closes 11/5/2026Opened 10/9/2026

Mississippi MS Department of Finance and Administration·Mississippi

74% match

Road Improvements – Trace State Park

Closes 11/19/2026Opened 10/20/2026

City of Brandon·Mississippi

74% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

Mississippi Department of Finance and Administration·Mississippi

74% match

Road Improvements (GS# 633-003)

Closes 11/19/2026Opened 10/20/2026

Neel-Schaffer, Inc·Mississippi

74% match

18766 Live Oak Avenue Drainage Improvements#21038

Closes 11/10/2026Opened 10/14/2026

City of Green Bay·Wisconsin

74% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Georgia Liberty County Board of Commissioners·Georgia

74% match

MAIN TRAIL ROAD IMPROVEMENTS

Closes 11/17/2026Opened 10/14/2026

U.S. Department Of Transportation·Mississippi

74% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

74% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Cobb County·Georgia

74% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

Platte County Parks Department·Missouri

73% match

Burlington Creek Bridge Remediation

Closes 11/5/2026Opened 10/19/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

Alaska Recreational Trails Program·Alaska

73% match

RTP Grant Application - Girdwood Beaver Pond Trail

Rolling / TBD closeOpened 9/24/2026

County of Fairfax·Virginia

73% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026