The City of Salina is seeking an engineering consulting firm to design and support the replacement of three existing 28‑in × 40‑in culverts on Fairdale Road, including hydraulic analyses, easement preparation, utility coordination, and construction‑phase assistance. The consultant will be responsible for updating hydrologic/hydraulic studies, producing design drawings and specifications, and facilitating easement acquisition and utility relocations within a tight schedule that targets design completion by early April 2027 and construction completion by November 2027.
• Perform hydraulic and hydrologic analyses for the culvert replacement, referencing the 2008 drainage study and downstream box‑culvert constraints.
• Deliver full design packages (drawings, specs, bid docs) and support easement and utility acquisition processes.
• Provide construction‑phase services, including plan advertisement, bid assistance, and oversight to ensure the project opens to traffic on schedule.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.