Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Civil Engineering
  5. ›Sixth Street, Avenue F & Avenue E Improvements

City of Garland·Texas

Sixth Street, Avenue F & Avenue E Improvements

Closes 9/24/2026$225k – $750kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Garland is soliciting sealed bids for the design‑build construction of the Sixth Street, Avenue F & Avenue E Improvements project. The scope includes roadway widening, utility relocation, pavement and sidewalk construction, and extensive work within the CPKC railroad right‑of‑way, including crossing surface rehabilitation and signal installation. The contractor must provide a 5 % bid bond, obtain all necessary permits, coordinate with the railroad for right‑of‑entry, and comply with Davis‑Bacon wage determinations. The contract will be awarded to the lowest responsive and responsible bidder, with performance, payment, and maintenance bonds required upon award. The project schedule is divided into two intermediate milestones and a final completion date, with liquidated damages applied for missed milestones. • Location: Garland, Texas (Dallas County) • Contract type: Sealed bid (Invitation for Bid) – bid bond 5 % required • Scope: Roadway widening, utility relocation, pavement, sidewalks, CPKC railroad crossing work (crossing surface & signal) • Estimated total project cost (including railroad portion) ≈ $1.4 M for rail work plus additional municipal improvements (likely total $5‑$8 M) • Key dates: Issue 2026‑08‑28, Questions due 2026‑09‑15, Bid submission deadline 2026‑09‑24 • Mandatory bonds: Bid bond, performance, payment, maintenance bonds • Required certifications: Davis‑Bacon wage rates, DBE compliance, insurance, resale certificates, etc. • Payment: Monthly confirming estimates with retainage (10 % or 5 % depending on contract size) and final retainage release after completion.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Liz Segura

[email protected]

(972) 205-2416

Key dates

Opened
8/28/2026
Questions due
9/15/2026
Closes
9/24/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
REQ00002265 Addendum 1

Budget estimate

$225,000 – $750,000

The bid documents reference a $1.36 M estimate for the railroad crossing portion and indicate extensive municipal improvements (roadway widening, utility relocation, pavement, sidewalks, traffic control, etc.). Comparable City of Garland street‑wide projects of similar scope typically range from $4 M to $8 M total. Assuming the municipal portion is roughly $3 M‑$6 M plus the $1.36 M rail work, the total contract value is likely between $4.5 M and $7.5 M. The contractor’s profit margin for public‑works construction is generally 5‑10 % after accounting for bonds, retainage, and indirect costs, resulting in an estimated net budget to the contractor of roughly $225 K‑$750 K.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Indianapolis·Indiana

Top match · 65%

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

Municipality of Anchorage·Alaska

65% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of El Paso De Robles·California

64% match

Riverside Avenue Improvements from 17th to 21st Street

Closes 11/5/2026Opened 9/24/2026

City of Stillwater·Oklahoma

63% match

Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04

Closes 11/17/2026Opened 10/17/2026

City of San Clemente·California

63% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

Georgia City of College Park·Georgia

63% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

City of Charlotte·North Carolina

63% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

City of Hastings·Nebraska

62% match

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Rolling / TBD closeOpened 9/18/2026

City of Indianapolis·Indiana

62% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/8/2026

City of Shawnee·Kansas

62% match

Ordinance No. 3494

Closes 7/16/2031Opened 7/16/2024

City of Indianapolis·Indiana

62% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/31/2026

City of Frazee, MN·Minnesota

62% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

City of Stillwater·Oklahoma

62% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026

City of Charlotte·North Carolina

62% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

City of Charlotte·North Carolina

62% match

6th and Graham Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027

Oregon City of Eugene·Oregon

62% match

2026 ITB 18 Lincoln St: 5th Ave - 13th Ave (Eugene)

Closes 11/3/2026Opened 10/8/2026

City of Riverside·California

62% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

Franklin County Courthouse Annex·Florida

61% match

ITB- CIGP 6th Street Eastpoint Widening and Resurfacing

Closes 12/15/2026Opened 10/17/2026

LA Public Works Engineering Bureau·California

61% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

Alaska Department of Transportation and Public Facilities·Alaska

61% match

ITB NFHWY00962 FAST ADA Improvements - Fairbanks: 6th and 7th Avenues

Closes 11/17/2026Opened 10/27/2026

Idaho Transportation Department·Idaho

61% match

Key No. 23883 2ND STREET S SAFETY IMPROVEMENTS

Closes 11/3/2026Opened 10/10/2026

Nevada Government·Nevada

61% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

NYS East Fishkill, Town of·New York

61% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Maple Grove·Minnesota

61% match

26-05 - Fernbrook Lane Improvements Phase 1

Closes 10/31/2026Opened 2/17/2026

Fort Monroe Authority·Virginia

61% match

Roof Replacement Building 6

Closes 11/12/2026Opened 9/29/2026