FY26 anticipated stone work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts
The U.S. Army Corps of Engineers is anticipating stone work requirements within the Mississippi Valley Division in the Memphis, Vicksburg, and New Orleans Districts during Fiscal Year 2026. The principle features of work include construction and repairs to existing dikes, revetments, chevrons, bendway weirs, and other river training structures at various locations. Additional land-based construction may include bank grading and dressing, excavation, placement of crushed stone blanket, riprap upper bank paving, placement of stone fill and stone paving in specified areas.
Some key points to consider:
• The work may include removal and redistribution of stone from dikes, revetments, and other areas.
• The work may include breaking out pavement, placing and painting range markers, and clearing range lines.
• The work will be performed in the Mississippi River, with varying water depths and currents.
• The projects are subject to change as designs are refined and impacts are quantified.
• Some projects are intended to be awarded under a Multiple Award Task Order Contract (MATOC) or a Single Award Task Order Contract (SATOC).
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.