The Douglasville-Douglas County Water and Sewer Authority is soliciting competitive sealed bids for the Birdie Drive Stormwater Improvement Project (Phase 1 and 2). The project involves installing an engineered Cured-In-Place Pipe (CIPP) liner in an existing 15-inch corrugated metal pipe (CMP) storm system and installing an engineered centrifugally cast concrete pipe (CCCP) liner in approximately 454 linear feet of existing 36-inch corrugated metal pipe (CMP). The project will be "turnkey" and require minimal involvement of Authority personnel.
• The project includes two phases: Phase 1 and Phase 2.
• The project requires a current Georgia Utility Contractors License and inclusion on the Authority's Approved Contractor List.
• Bids must be accompanied by adequate bid security (certified check, bid bond, or irrevocable letter of credit) drawn in favor of the Authority.
• The Authority reserves the right to award Phase 1 only, Phase 2 only, or Phases 1 and 2 together.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.