This solicitation seeks qualified contractors to upgrade the electrical distribution system, install a new facility‑generator building and switchgear, and perform associated civil, mechanical, and site‑work at the Wende Correctional Facility in Alden, NY. The scope includes full duct‑bank installation, concrete work for the generator building, transformer and switchgear installation, HVAC ventilation for the generator space, and extensive site preparation, utility relocation, and environmental compliance (SWPPP, tree‑removal windows, erosion control). The project is budgeted at $250,000‑$500,000 with a required bid deposit of $23,800 and includes minority‑business participation goals (15% MBE, 15% WBE, 3% SDVOB).
• Electrical distribution upgrade (13.2 kV system, new switchgear, transformer, and generator building).
• Civil and site work: duct‑bank excavation, asphalt removal/replacement, pavement milling, utility relocation, and erosion‑control measures.
• Mechanical/HVAC: ventilation, exhaust fans, and fuel‑oil system for the generator.
• Compliance: strict shutdown windows (max 4 hr per event), 72‑hour notice for utility work, mandatory coordination with perimeter security, and adherence to NY State building, fire, mechanical, and energy codes.