Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›ADA Manufactured Home Replacement - Bloomingdale

NYS PRIDE of Ticonderoga·New York

ADA Manufactured Home Replacement - Bloomingdale

Closes 2/4/2026$100k – $300kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

REQUEST FOR PROPOSALS (RFP) Bloomingdale Manufactured Home Replacement Project Issued by: North Country Rural Development (NRDC) I. INTRODUCTION North Country Rural Development (NRDC) is soliciting proposals from qualified manufactured home retailers and site work contractors to complete the replacement of a substandard manufactured home with a new, ADA compliant, ENERGY STAR® Certified manufactured home. This project is funded through the New York State HOME Program and must comply with the NYS HOME Program Manual for Manufactured Housing Replacement, as well as all applicable HUD, state, and local requirements. NRDC is not acting as a general contractor. Proposals are welcome from: Manufactured home retailers able to provide and install HUD- and ENERGY STAR–certified homes; Site work contractors able to complete demolition, foundation, utility connections, grading, and demolition work; or Teams that include both (NRDC can assist in connecting interested bidders). II. PROJECT OVERVIEW This scope of work provides a description of the required work. Contractors are responsible for confirming all field dimensions, site conditions, and detectable defects prior to bidding. Change orders will not be issued for discovery items that are not hidden defects. All work shall be performed in a “best practice” manner using materials equal to or better than those being replaced. Color selections, finishes, and similar aesthetic options shall be made by the NRDC client. Preferred Placement:It is preferred that the new home be placed adjacent to the current home when feasible, to minimize homeowner displacement. Total Project Cost: $__________ III. DETAILED SCOPE OF WORK A. Site Plan Contractor shall prepare and submit a detailed site plan prior to any construction or installation activity. B. Permitting Contractor is responsible for securing all necessary local and state permits for site work, foundation, septic, demolition, and utility connections. C. Site Evaluation Contractor shall perform a pre-construction site evaluation to identify subcontractors, site conditions, and necessary pricing updates. IV. MANUFACTURED HOME REQUIREMENTS Home Type:New, ENERGY STAR® Certified Manufactured Home meeting or exceeding the Manufactured Home Construction and Safety Standards (HUD Code, 24 CFR Part 3280) and ENERGY STAR Manufactured Home Program requirements per the NYS HOME Program Manual. The manufactured home shall be fully ADA compliant and meet applicable ADA Accessibility Guidelines. Certification: Home must bear both the HUD certification label (red tag) and the ENERGY STAR label affixed by the manufacturer. Documentation of ENERGY STAR certification must be provided at delivery. ADA & Accessibility Requirements (Minimum) Home must comply with ADA standards and HUD Section 504 requirements, including but not limited to: No-step primary entrance (coordinated with ramp design) Minimum 36” interior doorways Minimum 42” hallways where feasible Accessible bathroom with: Roll-in or low-threshold shower Reinforced walls for grab bars Accessible toilet and sink clearances Accessible kitchen with: Adequate turning radius Lowered or adjustable countertops where required Lever-style door handles and faucets Accessible thermostat and controls General Specifications (Minimum): 3 bedrooms, 2 baths VIN and serial number(s) must be recorded prior to installation Electric, all-energy system (no fossil fuel appliances) 200-amp electrical service Single-hung, Low-E vinyl windows Vinyl sheet flooring throughout 30” frost-free refrigerator with bottom freezer 30” electric range 30–40-gallon electric water heater ENERGY STAR certified, HUD-compliant heat pump or electric furnace with central A/C Insulation to meet HUD minimum standards (R-22 floor, R-21 walls, R-30 ceiling) ⅜" exterior OSB sheathing 25-year asphalt shingles 40-lb roof snow load minimum Gutters Location for well pressure tank to be installed inside the home (if on private water) V. FOUNDATION AND INSTALLATION Foundation Type:All foundation systems shall meet HUD durability standards, New York State Building Code, and cold-climate construction best practices to prevent frost heave and ensure long-term stability. Design Standards: Foundations must comply with HUD’s Design Guide for Frost-Protected Shallow Foundations (FPSF) or be constructed to extend below the local frost line. FPSF or frost-free systems must be sealed by a licensed engineer or architect and demonstrate compliance with IRC R403.3 and HUD guidelines. Insulation & Drainage: Insulation must meet HUD-recommended R-values for cold regions, be continuous, and protected from moisture and damage. Proper drainage and grading are required to divert water away from the foundation. Manufactured/Modular Homes: Systems must comply with HUD Model Manufactured Home Installation Standards (24 CFR 3285) and the June 21 2017 Interpretive Bulletin on frost-zone foundations. Frost-free alternatives require stamped professional design and local code approval. Verification: Contractor must submit foundation design, insulation layout, and drainage plan for approval. Work is subject to inspection and must be warranted against frost heave or settlement for at least one year. Concrete Pads:Minimum 3000 psi, with pre-set anchor hubs for tie-downs. Tie-down and anchoring systems must resist uplift, overturning, and lateral movement, per manufacturer’s specs. If an alternative engineered design is used, it must be certified by a licensed professional engineer and accepted by the local code official. Proper site grading and drainage shall be ensured to prevent frost heave. VI. SITE WORK & UTILITIES Site Preparation:Perform excavation and grading as required for proper home siting, drainage, and utility placement. Backfill with clean sandy fill. Utilities:Connect home to all utilities (electric, water, septic/sewer) in compliance with local codes. Water Testing:If on a private well, perform pre-removal and post-installation bacteriological water tests. Septic System:Pump, evaluate, and replace components as needed based on site conditions. Provide an evaluation report to NRDC. VII. SKIRTING & EXTERIOR Install insulated skirting with vapor barrier and flashing protection per manufacturer’s instructions. VIII. STEPS, LANDINGS, AND RAMPS Construct self-supporting, pressure-treated front and rear entry decks, landings, stairs, or ramps as required by local code. All ramps, landings, and entry systems shall be constructed to meet ADA accessibility standards, including slope, width, landing size, handrails, and surface requirements.No loads shall be transferred to the manufactured home structure. IX. GRADING & SEEDING Final grade disturbed areas, add minimum 2” topsoil, seed, and hay mulch for erosion control.Place ¾” stone around the foundation perimeter for drainage. X. DISPOSAL Contractor is responsible for complete removal and legal disposal of the existing home, additions, and debris at a licensed facility.Provide disposal receipts to NRDC. XI. FINAL APPROVAL Contractor must obtain a Certificate of Installation or local final inspection approval for the home’s setup and all site work.Post-construction radon testing shall be conducted on the lowest regularly occupied level. XII. PROPOSAL REQUIREMENTS Proposals must include: Company name, contact person, and license information Proof of insurance and workers compensation Itemized cost estimate Estimated project schedule Spec sheet for proposed model Floor plan demonstrating ADA-compliant layout and features NRDC welcomes separate proposals from home retailers and site contractors. If submitting separately, NRDC will coordinate partnerships between selected bidders to ensure full project delivery. One entity must act as the GC. XIII. SUBMISSION INFORMATION Proposal Due Date: Wednesday, February 4th, 2026 at 4:00pmSubmit Proposals To: [email protected] Questions may be directed to Hope Carroll at [email protected] or (518) 585-6366. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 10.00% Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 20.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 10.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Hope Carroll(Program Manager)

[email protected]

(518) 585-6366

Key dates

Opened
1/6/2026
Closes
2/4/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236115
Solicitation №
TBD

Budget estimate

$100,000 – $300,000

The budget for this project is not explicitly stated in the document, but based on the scope of work, which includes the installation of a new manufactured home and all necessary site work, the estimated budget could be in the range of $100,000 to $300,000. This estimate is based on the average cost of a new manufactured home and the costs associated with site preparation, foundation work, and exterior finishes. The actual budget may vary depending on the complexity of the project, the location, and the contractor's bid.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Colorado Pueblo Community College·Colorado

Top match · 64%

ADA Upgrades

Closes 12/3/2026Opened 10/21/2026

Colorado Pueblo Community College·Colorado

64% match

ADA Upgrades

Closes 12/3/2026Opened 10/30/2026

City of Murfreesboro·Tennessee

63% match

ADA Improvements at Cannonsburgh Village

Closes 11/10/2026Opened 10/20/2026

Miami-Dade County·Florida

63% match

Peace and Prosperity Rehab Program

Closes 11/9/2026Opened 10/22/2026

Cherokee Nation·Oklahoma

63% match

Solicitation A10-10-27-9686- Housing Replacement- Adair County

Closes 11/4/2026Opened 10/15/2026

City of Garland·Texas

63% match

Home Rehabilitation - 4317 Thicket Drive

Closes 11/3/2026Opened 10/22/2026

Plum Creek Library Systems·Minnesota

63% match

Plum Creek ADA Bathroom Remodel

Closes 12/11/2026Opened 10/23/2026

Virginia Community College System - System Office·Virginia

62% match

Renovate Bathrooms for ADA Compliance at Rappahannock Community College, Glenns and Warsaw Campuses, PC#260-B6260-029 (M24RC127)

Closes 11/12/2026Opened 10/13/2026

NYS PRIDE of Ticonderoga·New York

62% match

RFP Opportunity - 2 Lake Placid Manufactured Home Replacements

Closes 11/2/2026Opened 10/9/2026

Massachusetts Pioneer Valley Transit Authority·Massachusetts

62% match

IFB 27-002 - UMass Transit Facility LED Lighting Replacement Project

Closes 11/19/2026Opened 10/26/2026

Monroe County School District, FL·Florida

62% match

ITB 2026023 - AC Repairs and Replacements

Closes 11/19/2026Opened 10/22/2026

U.S. Department Of The Interior·Oregon

62% match

T--NHOTIC AV SYSTEM REPLACEMENT

Closes 11/20/2026Opened 10/7/2026

Maryland Anne Arundel Community College·Maryland

62% match

Air Handling Unit and Makeup Air Unit Replacements - AMIL & CALT

Closes 11/11/2026Opened 10/7/2026

California Department of Transportation·California

62% match

Reconstruct roadway and drainage system, & construct ADA facilities.

Closes 12/9/2026Opened 10/26/2026

Mono County California·California

62% match

Design‑Build Services for Manufactured Home Community (Mono County)

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

62% match

HOUSING ASSEMBLY,AI

Closes 11/30/2026Opened 10/29/2026

Lynwood Unified School District·California

61% match

Abbott Elementary School HVAC Units Replacement – Owner‑Furnished Contractor‑Installed HVAC Units

Closes 11/4/2026Opened 10/1/2026

City of Rosemead·California

61% match

CITY HALL ELEVATOR AND ADA IMPROVEMENTS PROJECT No. 31026

Closes 12/16/2026Opened 10/27/2026

NYS University District Community Development Association, Inc.·New York

61% match

UDCDA Home Rehabilitation Project

Closes 11/13/2026Opened 10/13/2026

City of Mobile·Alabama

61% match

Critical Repair - 1308 Brooke Avenue - Roof Replacement

Closes 11/10/2026Opened 10/28/2026

San Diego Unified School District·California

61% match

Thurgood Marshall Middle School Fire Main Backflow Preventer Replacement

Closes 11/6/2026Opened 10/27/2026

County of Riverside·California

61% match

Commercial Stackable Washer and Dryer

Closes 11/4/2026Opened 10/21/2026

City of Ormond Beach - Purchasing Office·Florida

61% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

Pembroke Housing Authority·Massachusetts

61% match

Window Replacement

Closes 11/10/2026Opened 10/19/2026

Norwood Housing Authority·Massachusetts

61% match

Tub Replacement - Phase 1

Closes 11/4/2026Opened 10/7/2026