The Stampede Penstock and Butterfly Valve Rehab project involves the rehabilitation of the Stampede Penstock and butterfly valves at the Washoe Project in California. The project includes the removal and control of water, blast and recoat of interior surfaces, waterjet and recoat of air-vac pipes, coatings spot repair, and the removal and replacement of valves. The contractor will be required to submit a schedule of values, construction program, and other documentation as part of the project. The project will be managed by the Bureau of Reclamation, and the contractor will be required to comply with all applicable laws and regulations.
Some key aspects of the project include:
• The contractor will be required to submit a schedule of values and construction program as part of the project.
• The project includes the removal and control of water, blast and recoat of interior surfaces, waterjet and recoat of air-vac pipes, coatings spot repair, and the removal and replacement of valves.
• The contractor will be required to comply with all applicable laws and regulations, including those related to environmental protection and worker safety.
• The project will be managed by the Bureau of Reclamation, and the contractor will be required to work closely with the agency to ensure the project is completed successfully.