Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Construction of 15.804 Miles of Maintenance (Other Than…

Mississippi

Construction of 15.804 Miles of Maintenance (Other Than Bridge) Roads “A”‑“E” – SAP‑42(8)M Project, Leflore County, MS

Closes 10/5/2026$5M – $12MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Leflore County Board of Supervisors, in partnership with the Mississippi Office of State Aid Road Construction, is soliciting sealed bids for the construction and maintenance of approximately 15.8 miles of county roads (designated “A”‑“E”) under State Aid Program Project SAP‑42(8)M. The work includes mobilization, excavation, granular base, multiple asphalt layers (base repair, overlay, leveling), traffic control devices, signage, and pavement markings. Bidders must submit a certified check or a 5 % bid bond payable to Leflore County and the State of Mississippi. The contract will be awarded to the lowest qualified bidder, with a performance period of 90 working days. All plans and specifications are available through the Mississippi e‑Planroom; electronic bids may also be submitted there. Minority business enterprises are encouraged to participate. • Scope: 15.804 mi of road maintenance (non‑bridge) – excavation, base, asphalt overlay/repair, traffic signs and pavement markings. • Contract type: Sealed bid, lowest qualified bidder, 5 % bid bond required. • Submission deadline: 3:00 PM, October 5, 2026 (paper bids at Leflore County Courthouse, Greenwood, MS). • Contract duration: 90 working days from award. • Plans available via www.weiplanroom.com (paper or digital). • Minority Business Enterprise participation encouraged. • Estimated project value likely in the low‑to‑mid‑millions (see payout estimate).

Attached files

Contact

Karla Allen

[email protected]

Key dates

Opened
9/23/2026
Closes
10/5/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
124-20260821130340 BSLC

Budget estimate

$5,000,000 – $12,000,000

Based on typical Mississippi road maintenance costs (approximately $300,000‑$800,000 per mile for the mix of excavation, base, multiple asphalt layers, and traffic devices), the 15.804‑mile scope suggests a total contract value in the range of $5 million to $12 million. Factors influencing the final amount include material price fluctuations (asphalt, aggregates), labor rates, and the exact quantities of signage and markings required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Mississippi Jasper County Board of Supervisors·Mississippi

Top match · 75%

Asphalt Paving and Road Improvements Project

Closes 11/2/2026Opened 10/30/2026

Mississippi

75% match

Construction of 0.094 Miles of Box Bridge and Approaches on County Road 16 (SABP‑31(01))

Closes 11/2/2026Opened 10/30/2026

Neel-Schaffer, Inc·Mississippi

74% match

NS.CS.222.065 Lowndes County LSBP-44(17) - Old Wolfe Rd.#21218

Closes 11/24/2026Opened 10/29/2026

U.S. Department Of Transportation·Mississippi

74% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Defense·Mississippi

73% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 7/22/2026

U.S. Department Of Defense·Mississippi

73% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 9/18/2026

Minnesota Department of Transportation·Minnesota

73% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Marshall County Board of Supervisors·Mississippi

73% match

Asphalt Paving Project Barringer Road and Dogwood Road DIP 448 for the Marshall County Board of Supervisors

Closes 11/6/2026Opened 10/8/2026

U.S. Department Of Defense·Louisiana

72% match

Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LA

Closes 6/12/2028Opened 5/28/2026

Lapeer County Road Commission·Michigan

72% match

2027 Lapeer Township Subdivision Paving

Closes 11/6/2026Opened 10/19/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

City of Baton Rouge and Parish of East Baton Rouge·Louisiana

72% match

McHOST ROAD IMPROVEMENTS 2 (LA Hwy 64 – Port Hudson – Pride Rd) PROJECT CITY-PARISH PROJECT No. 20-EN-HC-0107

Closes 11/17/2026Opened 10/2/2026

St. John the Baptist Parish Government·Louisiana

72% match

Bid 2026.21 Asphalt Road Maintenance Project

Closes 11/17/2026Opened 10/21/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area, Project #24-2, Plaquemines Parish, LA (ED 24-009)

Closes 12/4/2026Opened 12/5/2024

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

Minnesota Department of Transportation·Minnesota

71% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

Jackson County Board of County Commissioners·Florida

71% match

ITB 2627-02 - Milling, Resurfacing Old US Road-CR 167 FPID 453534-1-54-01

Closes 11/5/2026Opened 10/1/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

Butler County·Ohio

71% match

Symmes Road 42 – Inch Transmission Main Rehabilitation

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·North Carolina

71% match

P1555U Wallace Creek Service Road

Closes 12/1/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

St. Tammany Parish Government·Louisiana

71% match

Cross Gates Subdivision Highway Resurfacing Project

Closes 12/3/2026Opened 10/28/2026

Tate County Board of Supervisors·Mississippi

71% match

Tate County Ranger Lake Amenity Improvements

Closes 11/17/2026Opened 10/14/2026