Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Vermont
  4. ›Construction
  5. ›RFP for Pre-Manufactured Steel Building System Building

Town of Whitingham·Vermont

RFP for Pre-Manufactured Steel Building System Building

Closes 9/17/2026$200k – $400kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Whitingham, VT is soliciting proposals from manufacturers to supply a pre‑manufactured steel building system (PEMB) for a new municipal garage and office (~8,000 sf) that will house up to seven vehicle bays, offices, a conference room, and restrooms. The selected firm will act as part of the design team, provide design services, fabricate the steel building, and install it during construction. The town will provide the slab foundation and construction manager; the manufacturer must coordinate with the CM and may be required to submit a bid bond (5%) and performance bonds (100%). The project is budgeted at $4 M, with construction slated to begin Q2 2027 and be substantially complete by fall 2027. Local, minority‑, women‑owned, and Section‑3 businesses are encouraged to bid. • Scope: Design, fabricate, and install an 8,000 sf pre‑engineered steel building (7 vehicle bays, office space, conference room, restrooms). • Estimated total construction cost: $4,000,000; manufacturer’s lump‑sum fee to be determined (likely 5‑10% of construction cost). • Schedule: Bid opening 9/17/2026; construction start Q2 2027; completion fall 2027. • Bonds required: 5 % bid bond; 100 % performance/payment bond; $2 M liability insurance minimum. • Submission: One sealed original proposal to the Selectboard by 5 PM 9/17/2026; questions due 2 PM 9/10/2026. • Contact: Martha Ratcliffe (Phone (802) 257‑9329, Email mratcliffe@stevens‑assoc.com).

Attached files

Contact

Martha Ratcliffe

[email protected]

(802) 257-9329

Key dates

Opened
9/3/2026
Questions due
9/10/2026
Closes
9/17/2026
Duration
9 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
332311
Solicitation №
24-000

Budget estimate

$200,000 – $400,000

The RFP cites an overall construction cost of $4 M. Manufacturer fees for PEMB projects typically range from 5 % to 10 % of total construction cost, covering design, fabrication, and installation. Assuming a 5‑10 % lump‑sum fee, the expected revenue for the winning vendor would be roughly $200,000 to $400,000. Additional reimbursable expenses (transport, site coordination) could modestly increase the total, but the core budget range remains within this band.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Oregon Hillsboro School District 1J·Oregon

Top match · 72%

RFP - Architectural Services

Closes 11/23/2026Opened 10/23/2026

City of South San Francisco·California

70% match

RFP for Building and Fire Plan Review, Inspection, and Administrative Services (2027–2030)

Closes 11/20/2026Opened 10/14/2026

Michigan Mackinac Island Public School·Michigan

69% match

RFP

Closes 11/19/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

69% match

RFI: Fort Wolters H Barracks

Closes 11/4/2026Opened 10/21/2026

San Diego Unified School District·California

68% match

RFPQ-LLB: Groups K&L for Certain District Projects, Preconstruction & Construction Services

Closes 11/10/2026Opened 9/1/2026

LAUSD·California

68% match

DESIGN BUILD | RFQ # R-27016 - 107TH STREET ELEMENTARY | SEISMIC MODERNIZATION PROJECT

Closes 12/21/2026Opened 10/16/2026

Loudoun County Public Schools·Virginia

68% match

RFP #R27018 Building Commissioning Services

Closes 11/16/2026Opened 10/28/2026

Massachusetts City of Newburyport·Massachusetts

68% match

RFP No. 27-05: Demolition, Development, Construction & Lease of a Telecommunications Tower Facility

Closes 11/20/2026Opened 10/28/2026

Michigan Charlevoix Public Schools·Michigan

68% match

RFP for HS Welding Room Addtn & Science Room Renovations

Closes 11/10/2026Opened 10/28/2026

City of Branson·Missouri

68% match

RFP 2890-02 Fire Station 2 Radiant Heating System

Closes 11/4/2026Opened 10/5/2026

Connecticut City of Stamford·Connecticut

68% match

City RFP - Long Term Municipal Facilities Assessment Planning & Capital Facilit

Closes 11/12/2026Opened 10/15/2026

National Park Service·United States of America

68% match

Rolling RFP for Buildings at Fort Hancock

Rolling / TBD closeOpened 11/4/2025

City of Johnson City·Tennessee

67% match

RFP 6934 Back Up Radio System

Closes 12/10/2026Opened 10/23/2026

Georgia City of Milton·Georgia

67% match

RFP 27-CD01, Building Division Support Services

Closes 11/17/2026Opened 10/22/2026

City of Socorro·New Mexico

67% match

RFP 063026 – Design-Build Services for Compressed Natural Gas (CNG) Facility Upgrades

Rolling / TBD closeOpened 10/27/2026

Oregon Health and Science University·Oregon

67% match

Joint Architectural / Engineering and Construction Manager / General Contractor

Closes 11/3/2026Opened 1/1/2017

Oregon Health and Science University·Oregon

67% match

Construction Manager/General Contractor for the RLSB-7 Shell Build-out Project

Rolling / TBD closeOpened 4/21/2021

Inland Empire Utilities Agency·California

67% match

RP5 Storage Building Improvements

Closes 12/17/2026Opened 10/29/2026

Connecticut City of Stamford·Connecticut

67% match

City RFQ & RFP - Special Inspection Services at the New South School Lower Scho

Closes 11/12/2026Opened 10/22/2026

Maryland Montgomery County Government·Maryland

67% match

RFP #1197772 - Construction Services for North Bethesda Fire Station #43

Closes 11/6/2026Opened 10/1/2026

Lowcountry Council of Governments·South Carolina

67% match

RFP FOR PROFESSIONAL BUILDING INSPECTION SERVICES

Closes 11/20/2026Opened 10/26/2026

City of Bozeman·Montana

67% match

RFP - Lyman Transmission Rehabilitation Design and Construction

Closes 11/12/2026Opened 10/16/2026

Oregon Health and Science University·Oregon

67% match

Mechanical Contractors

Rolling / TBD closeOpened 11/6/2019

Texas City of San Antonio·Texas

67% match

RFQ 2026 - 101 Mechanical, Electrical and Plumbing (MEP) and Fire Protection

Closes 11/16/2026Opened 10/2/2026

Massachusetts Town of Westborough·Massachusetts

67% match

RFQ General and FSB Contractor for New Dispatch Facility

Closes 11/4/2026Opened 10/23/2026