Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›26066-B: Dredging - Crosstown Water Treatment Plant Lagoon

Georgia Fayette County Board of Commissioners·Georgia

26066-B: Dredging - Crosstown Water Treatment Plant Lagoon

Closes 12/16/2025$694k – $1.4MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Fayette County Board of Commissioners is seeking a qualified contractor to dredge the South Lagoon at the Crosstown Water Treatment Plant. The project entails pumping and dewatering the sludge on site with final disposal at an approved offsite facility. The contractor will be responsible for providing all labor, materials, tools, permits, insurance, and necessary equipment to load, transport, and deliver sludge from the Crosstown Water Treatment Plant to a properly permitted disposal site. • The contractor must provide a bid bond equal to 5% of the total amount bid. • The contractor must provide performance and payment bonds each equal to 100% of the contract value. • The contractor must comply with all applicable statutes, rules, and regulations regarding the disposal of municipal sludge materials. • The contractor must declare intent regarding disposal of materials with the bid. • The contractor must provide daily manifest of the weight of sludge removed and location of where disposed.

Attached files

Contact

Colette Cobb(Buyer Contact)

[email protected]

(770) 305-5115

Key dates

Opened
11/13/2025
Questions due
12/5/2025
Pre-bid meeting
12/2/2025Mandatory
Closes
12/16/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
26066-B

Budget estimate

$694,050 – $1,389,100

The estimated budget for this project can be determined by the cost per ton of dredging, dewatering, and disposal. The total volume to be removed is approximately 9294 cubic yards. Assuming an average weight of 1.5 tons per cubic yard, the total weight would be around 13,941 tons. With a cost per ton of $50-$100, the total budget would be approximately $694,050 to $1,389,100. However, this is a rough estimate and the actual budget may vary depending on various factors, including the actual weight of the sludge, the distance to the disposal site, and the cost of equipment and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Pennsylvania

Top match · 73%

RESERVE BASIN MAINTENANCE DREDGING CONTRACT FOR SITES AT THE PHILDELPHIA NAVY YARD IN THE PUBLIC WORKS DEPARTMENT PENNSYLVANIA AREA OF RESPONSIBILIY

Closes 1/15/2027Opened 10/9/2026

City and County of San Francisco·California

73% match

EXT REC | CON27-0001 Marina Dredging - RFQ SFFirst

Closes 12/31/2026Opened 7/14/2026

City and County of San Francisco·California

73% match

EXT REC | CON26-0001 Marina Dredging - SF First

Closes 12/31/2026Opened 11/24/2025

U.S. Department Of Defense·Louisiana

73% match

Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025

Closes 6/18/2028Opened 6/3/2026

U.S. Department Of Defense·Louisiana

72% match

Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1

Closes 10/1/2028Opened 9/1/2026

U.S. Department Of Defense·Louisiana

72% match

Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,

Closes 2/5/2027Opened 12/11/2024

U.S. Department Of Defense·Texas

72% match

FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING

Closes 11/2/2026Opened 8/31/2026

U.S. Department Of Defense·Louisiana

72% match

Barataria Bay Waterway, Maintenance Dredging (Non-Continuous) Bayou Rigaud, Jefferson Parish, Louisiana (ED-25-008)

Closes 8/16/2028Opened 8/17/2026

U.S. Department Of Defense·Louisiana

72% match

Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025

Closes 6/18/2028Opened 6/22/2026

U.S. Department Of Defense·Louisiana

71% match

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

Closes 3/31/2027Opened 10/5/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 7-2025 (OM25007)

Closes 3/23/2027Opened 3/25/2025

U.S. Department Of Defense·Virginia

71% match

Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia

Closes 11/23/2026Opened 10/21/2026

Cleveland Metroparks·Ohio

71% match

Cleveland Metroparks Marina Dredging Years 2027-2031, Parkwide

Closes 11/3/2026Opened 10/1/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

Connecticut City of Norwalk·Connecticut

71% match

DPW2026-2 DREDGING OF STORM OUTFALL AT 160 WATER STREET

Closes 11/19/2026Opened 10/30/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

Tulsa County·Oklahoma

71% match

Dredging at LaFortune Park Golf Course

Closes 11/2/2026Opened 9/21/2026

Toledo - Lucas County Port Authority·Ohio

71% match

Remedial Action for Lower Maumee River Sway Bridge within the Maumee Area of Concern

Closes 12/8/2026Opened 10/29/2026

Alabama State Port Authority·Alabama

71% match

BID – Lower Harbor ODMDS Dredging

Closes 11/4/2026Opened 10/16/2026

U.S. Department Of Defense·Louisiana

71% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 9/11/2026

U.S. Department Of Defense·Washington

71% match

FY26 Willapa Harbor Maintenance Dredging

Closes 11/5/2028Opened 10/17/2025