The City of Reno is seeking qualified contractors to replace the existing pedestrian bridge at Paradise Park. The contract covers complete demolition of the existing structure, construction of new concrete abutments and wing‑walls, installation of a pre‑fabricated steel truss bridge, pavement and curb replacement, rip‑rap channel restoration, and associated site work such as grading, utility relocation, and landscaping. All work must comply with Nevada statutes on apprentices, prevailing‑wage, environmental controls, and safety regulations, and the contractor must provide bid, performance, and labor‑materials bonds as well as insurance.
• Demolition of existing bridge, abutments, footings, handrails, curbs, utilities, trees, and rip‑rap.
• Construction of two new concrete abutments, wing‑walls, and installation of a prefabricated pedestrian bridge supplied by the Owner.
• Site improvements including asphalt pavement, concrete curbs, bollards, handrails, rip‑rap placement, and storm‑water pollution prevention measures.
• Required compliance with Nevada Revised Statutes (apprenticeship, prevailing‑wage, licensing), SWPPP, dust‑control permits, and extensive testing/inspection of concrete, steel, and soil.