Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Pre-Qualification for Prima Zone 4 Phase A Main Gas Line…

County of Orange·California

Pre-Qualification for Prima Zone 4 Phase A Main Gas Line Project

Closes 9/18/2026$8M – $10.5MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Orange is seeking pre‑qualified contractors to design, permit, and construct a new landfill‑gas collection and control system (LFGCCS) header for Zone 4 Phase A at the Prima Deshecha Landfill. The scope includes trenching, installing HDPE pipe, valves, tie‑ins to existing infrastructure, back‑filling, testing, and site restoration, with strict traffic‑control and coordination requirements. An estimated $9.12 M construction cost will be advertised for bids in September 2026, and only contractors who pass the pre‑qualification process may submit a bid. • Design, permitting, and construction of a new HDPE gas‑header system (approx. 9 M USD project) • Required Class A General Engineering Contractor license and DIR registration • 210‑day contract schedule (plus 30 weather days) • Mandatory pre‑bid meeting & site visit on 9/24/2026 at the landfill site (32250 Avenida La Pata, San Juan Capistrano, CA) • Pre‑qualification questionnaire due 9/18/2026; questions due 9/11/2026 • Bonding capacity of at least $9,120,900 and $3 M general liability coverage required • Submission of references for six similar public projects, insurance, and surety statements • Evaluation based on essential requirements, licensing, bonding, organizational performance, and past project references.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Albert Rodriguez(Deputy Purchasing Agent)

[email protected]

(714) 667-9662

Key dates

Opened
9/2/2026
Questions due
9/11/2026
Pre-bid meeting
9/24/2026Mandatory
Site visit
9/24/2026Mandatory
Closes
9/18/2026
Duration
210 days

Last updated

Details

Type
Request for Qualification
Industry
Construction
NAICS
237120
Solicitation №
299-3104108-AR-PQ

Budget estimate

$8,000,000 – $10,500,000

The solicitation estimates the construction cost at $9,120,900. Assuming the contract award follows the typical public‑works fee structure (approximately 5‑10 % contractor profit plus overhead), the net revenue to the winning contractor would likely fall between roughly $8 M and $10.5 M, depending on final change orders, bonding costs, and any schedule adjustments.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Public Water Supply District No. 2 of St. Charles County·Missouri

Top match · 69%

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of San Jose·California

69% match

Pre-Qualification: St. James Park Phase 1 - North East Corner

Closes 11/2/2026Opened 9/23/2026

Snowline Joint Unified School District·California

68% match

Notice to Pre-Qualify for 2026 Public Works

Rolling / TBD closeOpened 12/8/2025

Power Authority of New York·New York

68% match

Spot Natural Gas Supply - Richard M. Flynn Power Plant

Closes 12/31/2026Opened 3/27/2024

City of San Jose·California

67% match

Pre-Qualification: BUILDING: Fire Station No. 36 - New (2018 Measure T)

Closes 11/20/2026Opened 10/21/2026

Power Authority of New York·New York

67% match

Request for Qualifications For Pre-Commercial Energy Storage Pipeline

Rolling / TBD closeOpened 3/31/2026

City of Philadelphia·Pennsylvania

67% match

PW Prequal Bid 2785-RELAY of WATER MAINS and Construction of GSI in S 61ST

Closes 12/31/2026Opened 9/22/2026

Town of Byhalia·Mississippi

67% match

Natural Gas Services for Marshall Trade Center

Closes 12/2/2026Opened 10/29/2026

Town of Leesburg·Virginia

67% match

RFQ No 320830-FY27-15 Pre-Qualification for Construction - Leesburg Executive Airport Air Traffic Control Tower

Closes 11/23/2026Opened 10/26/2026

Imperial Irrigation District·California

67% match

Unit 4 Repowering Project - Engineering, Procurement, and Construction Services

Closes 11/25/2026Opened 7/24/2026

City of Irvine·California

66% match

Pre-Qualification of Bidders - Great Park Cultural Terrace Phase IV - Landscape & Site Improvements

Closes 11/5/2026Opened 10/7/2026

Town of Leesburg·Virginia

66% match

Pre-Qualification for Construction - Leesburg Executive Airport Air Traffic Control Tower

Closes 11/23/2026Opened 10/26/2026

Connecticut UConn Health Center·Connecticut

66% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

Washington Metropolitan Area Transit Authority (WMATA)·District of Columbia

66% match

FRSMP277009/JLM-Lighting Phase 2

Closes 12/2/2026Opened 10/23/2026

North Carolina City of Raleigh·North Carolina

66% match

Prequalification: Raleigh Convention and Performing Arts Complex - Expansion and Relocation

Closes 11/30/2026Opened 10/30/2026

El Paso Water·Texas

66% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

New York City Department of Design and Construction·New York

66% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 4/24/2025

Board of County Commissioners, Palm Beach County·Florida

66% match

Prequalification-Annual Contract Asphalt, Pavers & Pathway

Closes 9/8/2027Opened 1/31/2023

Palm Beach County Purchasing Department·Florida

66% match

REQ FOR PRE-QUAL OF VENDORS FOR LABORATORY GASES

Closes 3/25/2029Opened 3/26/2024

Georgia City of Commerce·Georgia

65% match

27-002 Gas Main Installer

Closes 11/6/2026Opened 10/5/2026

New York City Department of Design and Construction·New York

65% match

Installation of Styrene-Butadiene-Styrene (SBS) Modified Bitumen Roofing System

Rolling / TBD closeOpened 4/24/2025

NYS Greenburgh, Town of·New York

65% match

Lead Service Lines Identification Project - Phase I

Closes 12/1/2026Opened 10/28/2026

El Paso Water·Texas

65% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

City of Long Beach·California

65% match

On-Call Construction

Closes 11/25/2026Opened 10/21/2026

Orange County Department of Education·California

65% match

Rancho Sonado Project: MEP Prequalification Application

Rolling / TBD closeOpened 10/16/2026