The City of Nashua is seeking bids from qualified firms to design and build a new wading pool at Greeley Park. The project includes a complete replacement of the existing wading pool in the same location, with design and construction of a new wading pool, installation of new intake and discharge water lines, and construction of new concrete decking around the pool. The City will be responsible for demolition and removal of the existing pool, as well as excavation and grading for the new pool. The selected vendor will be expected to provide some oversight during excavation activities. Key features of the project include a reinforced gunite structure, pebble surface finish, and various pool equipment such as pumps, filters, and skimmers. The project must be completed no later than May 21, 2027, with liquidated damages of $500 per calendar day assessed for delays beyond this date.
• The project requires a complete replacement of the existing wading pool with a new reinforced gunite structure.
• The new pool will have a pebble surface finish and various pool equipment such as pumps, filters, and skimmers.
• The City will be responsible for demolition and removal of the existing pool, as well as excavation and grading for the new pool.
• The selected vendor will be expected to provide some oversight during excavation activities.
• The project must be completed no later than May 21, 2027, with liquidated damages of $500 per calendar day assessed for delays beyond this date.