Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Repair and Widen Taxiways Phase III, PSTE 162013

U.S. Department Of Defense·South Carolina

Repair and Widen Taxiways Phase III, PSTE 162013

Closes 8/15/2026$10M – $25MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Air Force is seeking a contractor to repair and widen taxiways at McEntire Joint National Guard Base in South Carolina. The project involves removing existing substandard concrete and asphaltic pavement, installing new base course, concrete pavement, and storm water drainage improvements. The contractor will also need to relocate taxiway edge lights, signage, and paint taxi lines. The project is set aside 100% for small businesses, and the North American Industry Classification (NAICS) code is 237310. The magnitude of the project is between $10,000,000 and $25,000,000. The project will occur in two stages, with a total contract duration of 365 days after notice to proceed. • The first stage will consist of an anticipated 180-day pre-construction period for submittal approval, testing, mix designs, submission of required permits, etc. • The second stage will consist of an anticipated 180-days of actual construction. • No work shall begin on stage two until the government has fully accepted stage one and issued a separate notice to proceed. • The contractor must comply with the limitations on subcontracting clause, which states that the contractor cannot pay more than 85% of the amount paid by the government for contract performance to subcontractors that are not similarly situated entities.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jonathan Bailey

[email protected]

(803) 583-8571

Key dates

Opened
3/17/2026
Closes
8/15/2026
Duration
365 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
W50S9526BA002

Budget estimate

$10,000,000 – $25,000,000

The budget for this project can be estimated based on the project magnitude, which is between $10,000,000 and $25,000,000. Considering the scope of work, including the removal of existing pavement, installation of new base course and concrete pavement, and storm water drainage improvements, the estimated budget is likely to be closer to the higher end of the range. Factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the contractor's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·South Carolina

Top match · 82%

PSTE 162013 Repair and Widen Taxiways, Phase III

Closes 1/29/2027Opened 1/29/2026

Raleigh Durham Airport Authority·North Carolina

75% match

Taxiway F Pavement Repairs - 2026

Closes 11/9/2026Opened 10/8/2026

Port of Portland·Oregon

74% match

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes 11/4/2026Opened 10/8/2026

U.S. Department Of Defense·Virginia

72% match

Repair Taxiway Pavements (Phase 3 and 4) Naval Air Station Oceana, Virginia

Closes 11/5/2026Opened 10/21/2026

Raleigh Durham Airport Authority·North Carolina

71% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

Niagara Frontier Transit Authority (NFTA)·New York

71% match

12NA2603 - NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/6/2026

Calhoun County Board of County Commissioners·Florida

71% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

Port of Portland·Oregon

70% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

NYS Niagara Frontier Transportation Authority·New York

68% match

NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/5/2026

City of Charlotte·North Carolina

68% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Town of Bluffton·South Carolina

68% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

U.S. Department Of Defense·South Carolina

68% match

Repair Taxiway Alpha & Bravo - North Auxiliary Airfield

Closes 12/2/2026Opened 10/30/2026

Delaware Coastal Airport·Delaware

68% match

COMING SOON - Georgetown, DE - Delaware Coastal Airport - Construct Taxiway B - Bid Pkg. 3 (25031)

Rolling / TBD closeOpened 10/22/2026

City of Charlotte·North Carolina

68% match

Runway 18/36 and Taxiway Delta Rehab Construction

Rolling / TBD closeOpened 12/14/2026

Port of Tacoma·Washington

68% match

TOTE Terminal Pavement Maintenance and Repair (2026)

Closes 11/17/2026Opened 10/31/2026

Delta Airport Consultants·Virginia

68% match

COMING SOON - Richmond, VA - Richmond Executive-Chesterfield Airport - Extend Runway 15-33 (20030)

Rolling / TBD closeOpened 5/1/2026

Texas Department of Transportation·Texas

67% match

TxDOT Aviation Division- Notice to Bidders

Closes 11/17/2026Opened 10/13/2026

Massachusetts Town of Montague·Massachusetts

67% match

Turners Falls Municipal Airport - Realign Taxiway A1 and Reconstruct Pioneer Apron

Closes 11/11/2026Opened 10/21/2026

City of Slidell·Louisiana

67% match

27-B009 Taxilane Mill and Overlay

Closes 11/10/2026Opened 10/7/2026

Virgin Islands Port Authority·U.S. Virgin Islands

67% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

67% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/16/2026

City of Toledo·Ohio

67% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

Georgia Turner County Board of Commissioners·Georgia

66% match

Turner County Airport � Apron/Stub Taxiway Rehabilitation Project

Closes 11/17/2026Opened 10/16/2026

City of Philadelphia·Pennsylvania

66% match

PW Bid 3993ECMS - MPMS 82199 Cottman Ave Redesign with GSI

Closes 12/3/2026Opened 10/16/2026

City of Doge City·Kansas

66% match

Trail St & Overpass CCLIP (closed 10/20)

Rolling / TBD closeOpened 9/15/2026