The Ohio University Glidden Hall renovation project calls for a design‑build upgrade of HVAC systems, building‑automation controls, and acoustical treatments across multiple floors of the historic academic building. The contractor will demolish existing ceiling assemblies, install new dual‑duct air‑handling units, VAV boxes, humidifiers, fire‑stop systems, and integrate a BACnet/IP‑based building automation system, while also providing commissioning, training, and a twelve‑month warranty.
• Demolition of existing ceiling tiles, drywall, and metal furring; installation of new 12 × 12 in. acoustic ceiling tiles with metal edge trim.
• Supply, install, and commission dual‑duct AHUs, VAV boxes, humidifiers, exhaust fans, and associated ductwork, controls, sensors, and fire‑stop sealing per UL 1479/C115.
• Provide low‑voltage BACnet/IP building automation system, programming, graphics, training (16 hours), and a 12‑month warranty plus optional extended support.