Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Construction of 3.913 miles of RESEAL (MICRO-SURFACING) on…

Mississippi George County Board of Supervisors·Mississippi

Construction of 3.913 miles of RESEAL (MICRO-SURFACING) on the Brushy Creek Road

Closes 4/6/2026$785k – $2.0MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The George County Board of Supervisors is seeking bids for the construction of 3.913 miles of RESEAL (MICRO-SURFACING) on the Brushy Creek Road. The project includes various roadway items such as mobilization, unclassified excavation, crushed stone, asphalt, and more. The award will be made to the lowest qualified bidder on the basis of published quantities. The project shall be constructed in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction. • The project includes 3.913 miles of RESEAL (MICRO-SURFACING) on the Brushy Creek Road • The project includes various roadway items such as mobilization, unclassified excavation, crushed stone, asphalt, and more • The award will be made to the lowest qualified bidder on the basis of published quantities • The project shall be constructed in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction • Plans and specifications are on file in the Office of the Chancery Clerk of George County, the County Engineer's office, and the Office of the State Aid Engineer

Attached files

Contact

Alison Mitchell

[email protected]

Key dates

Opened
3/18/2026
Closes
4/6/2026
Duration
40 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
SAP 20(16)S

Budget estimate

$785,000 – $1,956,500

Based on the project description, the budget can be estimated by considering the cost of materials and labor for the construction of 3.913 miles of RESEAL (MICRO-SURFACING) on the Brushy Creek Road. The cost of materials such as crushed stone, asphalt, and emulsified asphalt, as well as labor costs for mobilization, excavation, and construction, will contribute to the overall budget. Assuming an average cost per mile of $200,000 to $500,000, the total budget for the project can be estimated to be between $785,000 and $1,956,500.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Transportation·Mississippi

Top match · 70%

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

City of Fairfield·Ohio

69% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

City of Toledo·Ohio

69% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

U.S. Department Of Transportation·Arizona

69% match

AZ BL COLO 7528(1) Burro Creek Road

Closes 11/17/2026Opened 10/15/2026

Cobb County·Georgia

68% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Nevada Government·Nevada

68% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Georgia Liberty County Board of Commissioners·Georgia

68% match

MAIN TRAIL ROAD IMPROVEMENTS

Closes 11/17/2026Opened 10/14/2026

Montana Department of Transportation·Montana

68% match

Scrub Seal Hodges Road Miles City Area

Closes 11/3/2026Opened 10/1/2026

Massachusetts Department of Transportation·Massachusetts

68% match

610728 LEE FAP No. NHP(NHS)-003S(967)X Resurfacing and Related Work on Route 20

Closes 11/10/2026Opened 9/14/2026

County of Fairfax·Virginia

68% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

St. Tammany Parish Government·Louisiana

68% match

Cross Gates Subdivision Highway Resurfacing Project

Closes 12/3/2026Opened 10/28/2026

City of Charlotte·North Carolina

67% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

City of Cincinnati·Ohio

67% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Bay County·Florida

67% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

Bay County, FL·Florida

67% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

U.S. Department Of Transportation·Washington

67% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

Butler County·Ohio

67% match

Symmes Road 42 – Inch Transmission Main Rehabilitation

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of The Interior·Colorado

67% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

U.S. Department Of Defense·South Dakota

67% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

U.S. Department Of Defense·Nebraska

67% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 9/22/2027Opened 9/22/2026

Orangeburg County·South Carolina

67% match

Roadway, Water, and Wastewater Improvements to Chase Street

Closes 12/3/2026Opened 10/26/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

67% match

Abandoned Mine Reclamation – Beulah Road (Lucia Drive)

Closes 11/12/2026Opened 10/16/2026

City of Charlotte·North Carolina

67% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Cedar Rapids·Iowa

66% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

Texas Department of Transportation·Texas

66% match

STATE LET CONSTRUCTION CONTRACT, SHELBY CO, RESURFACE ROADWAY

Closes 11/3/2026Opened 10/7/2026