The State University of New York at Stony Brook is soliciting qualifications from consultants to provide design and engineering services for the upgrade of the East Plant unit substation and associated electrical equipment. The existing low voltage switchgear is to be replaced, and the new switchgear will provide power to the heating systems as well as other loads. The project includes the installation of a new secondary unit-substation and the transfer of loads from the existing switchgear to the new one.
• The project requires the design and engineering services for the upgrade of the East Plant unit substation.
• The existing low voltage switchgear is to be replaced with a new one.
• The new switchgear will provide power to the heating systems and other loads.
• The project includes the installation of a new secondary unit-substation.
• The loads will be transferred from the existing switchgear to the new one.
• The project requires the demolition of the existing switchgear and the installation of the new one.
• The project also requires the removal of abandoned equipment and the patching of holes in pull-boxes and equipment.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.