Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Civil Engineering
  5. ›Light Rail Camp Meade Slope Stabilization [ T-2164-0150]…

Maryland Transit Administration·Maryland

Light Rail Camp Meade Slope Stabilization [ T-2164-0150] 031926

Closes 4/13/2026$100k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Maryland Transit Administration is seeking bids for the construction of permanent corrective measures for existing drainage and erosion damage adjacent to LTR tracks to prevent future recurrence near Linthicum Station, S. Camp Meade Road Grade Crossing, and the BWI Rail Spur. The project is to be coordinated with a proposed MTA Light Rail shutdown period. The estimated value for this contract is in the range of $100,001 to $500,000. The contract duration is 365 calendar days from Notice to Proceed. The project requires the contractor to perform work such as excavation, fill, and installation of gabions, riprap, and other erosion control measures. The contractor must also ensure that the work is done in accordance with the contract documents, including the special provisions, and that all necessary permits and approvals are obtained. • The project involves slope stabilization and erosion control measures • The project requires coordination with a proposed MTA Light Rail shutdown period • The estimated contract value is between $100,001 and $500,000 • The contract duration is 365 calendar days from Notice to Proceed • The project requires the contractor to perform various types of work, including excavation, fill, and installation of erosion control measures

Attached files

Contact

Jodie Biden(Procurement Officer)

[email protected]

(667) 262-2962

Key dates

Opened
3/19/2026
Questions due
3/26/2026
Pre-bid meeting
3/25/2026
Site visit
3/23/2026
Closes
4/13/2026
Duration
365 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
BPM055992

Budget estimate

$100,001 – $500,000

Based on the estimated contract value range of $100,001 to $500,000, the budget for this project could be anywhere within this range, depending on the bidder's proposed price and the actual work performed. The budget may be influenced by factors such as the complexity of the work, the materials and labor required, and the contractor's overhead costs. A reasonable estimate for the budget could be around $300,000, assuming a mid-point of the estimated contract value range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Maryland Baltimore County Government·Maryland

Top match · 70%

26030 GX0 Old Frederick Road Slope Stabilization

Closes 11/5/2026Opened 8/29/2026

U.S. Department Of The Interior·Colorado

70% match

Y--VICK 209252 Stabilize Mint Spring Bayou & VICK 310725/324137 Stabilize Terraces

Closes 3/13/2027Opened 3/13/2025

Agency of Transportation - Contract Administration·Vermont

68% match

Rockingham REGM2336 & REGM 2337

Closes 11/6/2026Opened 10/14/2026

Virginia Department of Transportation·Virginia

67% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

Placer County·California

66% match

20693 - Olympic Valley Road Snow Removal

Closes 11/3/2026Opened 10/16/2026

U.S. Department Of Veterans Affairs·Washington

66% match

5650--American Lake B81 Lab Roof

Closes 11/1/2026Opened 9/2/2026

Village of Cary·Illinois

65% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

U.S. Department Of The Interior·Colorado

65% match

Z--JELA 325250 335621

Closes 7/16/2028Opened 7/16/2026

U.S. Department Of The Interior·Wyoming

65% match

Y--GRTE 237343 - Rehab 4 Lazy F Ranch

Closes 11/20/2026Opened 10/5/2026

Santa Clara Valley Transportation Authority·California

65% match

Guadalupe Light Rail Vehicle Wash Improvements

Closes 11/13/2026Opened 9/16/2026

City of Virginia Beach·Virginia

65% match

COVB-27-4101732_Landscape Maintenance for Neighborhood Parks II

Closes 12/1/2026Opened 10/28/2026

U.S. Department Of Veterans Affairs·Ohio

65% match

C1DA--AE Replace Roofing 539-25-101

Closes 11/4/2026Opened 10/20/2026

California Department of General Services·California

65% match

CONTRACT NUMBER: 26-330888; CHPERS I: REPLACEMENT OF TOWERS AND VAULTS ¿ LEVIATHAN PEAK CALIFORNIA HIGHWAY PATROL ALPINE COUNTY, CA ; PROJECT NUMBER: 122805LL

Closes 11/17/2026Opened 8/21/2026

Power Authority of New York·New York

65% match

ST. LAWRENCE SHORELINE STABILIZATION CONSTRUCTION

Closes 11/13/2026Opened 10/22/2026

California Department of Corrections and Rehabilitation·California

65% match

C5613351-D - Concrete Debris Removal and Slope Stabilization Services

Closes 12/9/2026Opened 10/19/2026

U.S. Department Of Transportation·Washington

64% match

WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4

Closes 11/13/2026Opened 9/30/2026

U.S. Department Of The Interior·Louisiana

64% match

JELA 325250 335621 - Rehabilitate Cemetery

Closes 12/10/2026Opened 10/5/2026

U.S. Department Of Defense·Texas

64% match

Base operations support services at Fort Leonard Wood and Lake of the Ozarks Army Recreation Area (LORA).

Closes 10/5/2027Opened 2/10/2025

U.S. Department Of Veterans Affairs·Kentucky

64% match

CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES

Closes 11/13/2026Opened 10/8/2026

Town of Southampton·New York

64% match

Royal Avenue North Shoreline Stabilization and Water Quality Improvements

Closes 11/18/2026Opened 10/22/2026

U.S. Department Of Veterans Affairs·Pennsylvania

64% match

Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC

Closes 11/20/2026Opened 10/23/2026

Maryland Prince George's County Government·Maryland

64% match

WS2273625786 - Supplemental Push Snow (Plow-Only Services) Winter Operations – Mechanical Snow Removal

Closes 2/28/2027Opened 6/23/2026

U.S. Department Of Veterans Affairs·Delaware

64% match

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

California Department of Parks and Recreation·California

64% match

C26950006 - Inland Empire District - Alarm Monitoring Service Contract

Closes 11/6/2026Opened 10/19/2026

U.S. Department Of Veterans Affairs·Delaware

64% match

Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152)

Closes 11/4/2026Opened 10/6/2026