Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›MIDDLE MISSISSIPPI RIVER STONE DIKE ALTERATION (NESP)

U.S. Department Of Defense·Missouri

MIDDLE MISSISSIPPI RIVER STONE DIKE ALTERATION (NESP)

Closes 6/1/2026$10M – $50MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to modify and construct river training structures in the Mississippi River near Herculaneum, Missouri and Ste. Genevieve, Missouri. The work consists of modifying 44 structures and constructing two new structures entirely from recycled stone from the modified structures. The project requires traditional river marine construction equipment, such as floating plant and barge mounted crane. Key aspects of the project include: • Modifying and constructing river training structures • Modifying 44 existing structures • Constructing two new structures from recycled stone • Using traditional river marine construction equipment • Working in two separate ten-mile reaches of the Mississippi River The firm will be responsible for furnishing all plant, labor, material, and equipment and performing all operations in connection with the repair of existing or construction of new stone structures, revetments, notching or removal of existing structures, and appurtenant work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

ABRIELLE CAMPBELL

[email protected]

(314) 331-8690

Key dates

Opened
6/1/2026
Closes
6/1/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
W912P926BA0040001

Budget estimate

$10,000,000 – $50,000,000

The budget for this project can be estimated based on the scope of work, which involves modifying 44 existing structures and constructing two new structures. The cost of traditional river marine construction equipment, labor, and materials will also contribute to the overall budget. Considering the complexity and scale of the project, the budget could range from $10 million to $50 million. Factors that may influence the likely payment range include the cost of equipment, labor, and materials, as well as the firm's experience and expertise in similar projects.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Missouri

Top match · 69%

LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

Closes 12/9/2026Opened 10/6/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Missouri

67% match

LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

Closes 11/16/2026Opened 3/31/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, New Orleans Harbor And Various Bar Channels Cutterhead No 4-2025

Closes 3/18/2028Opened 3/18/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

67% match

Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011)

Closes 7/16/2027Opened 7/16/2025

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 9-2026 (OM26009)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 4/27/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 8-2026 (OM26008)

Closes 5/7/2028Opened 4/15/2026

City of Madison·Wisconsin

66% match

Castle Creek Channel Improvements at Warner Park

Closes 11/5/2026Opened 10/23/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 10-2025 (OM25010)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, New Orleans Harbor Cutterhead Dredge No. 2-2025

Closes 5/10/2027Opened 3/28/2025

U.S. Department Of Transportation·Mississippi

66% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026