The College of Coastal Georgia is seeking bids for the replacement of the gym floor in the Coffin Building. The project includes demolishing the existing gym floor, installing a new Aacer MFMA certified floor system, and applying game lines, painting, and staining to match the existing artwork and color scheme. The contractor will be responsible for furnishing all materials and performing all work required by the contract documents. A mandatory pre-bid meeting will be held on May 6, 2026, at 2:00 PM.
• The project requires the demolition of the existing gym floor to the bare concrete.
• The installation of approximately 10,070 square feet of Aacer MFMA certified floor system.
• The application of game lines, painting, and staining to match the existing artwork and color scheme.
• The contractor must attend the mandatory pre-bid meeting on May 6, 2026, at 2:00 PM.
• The contract will be awarded to the lowest responsive and responsible bidder.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.