Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Construction
  5. ›City of Mount Rainier Safe Streets and Roads for All…

Maryland City of Mount Rainier·Maryland

City of Mount Rainier Safe Streets and Roads for All (SS4A) Levee Trail Crossing at Chillum Road Project

Closes 4/27/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Mount Rainier is soliciting bids from qualified construction companies for the Safe Streets and Roads for All (SS4A) Levee Trail Crossing at Chillum Road Project. The project includes demolition of existing pavements, erosion control, signing and pavement markings, proposed concrete sidewalk and curb, saw cut, proposed concrete median, proposed asphalt pavement, proposed raised crossing, three phases of suggested maintenance of traffic, proposed rectangular rapid flashing beacon, Americans with Disabilities Act (ADA) compliance form work, and proposed trench drain. The contractor shall perform all work in accordance with the lines, grades, typical cross sections, dimensions, and other data shown on the Plans. • The contractor will be required to attend progress meetings during construction and submit weekly progress reports. • The contractor will be required to have a designated engineer dedicated to the project. • The contract will include liquidated damages in the amount of $300 per calendar day for each consecutive calendar day beyond the date of substantial completion. • The contractor must comply with applicable requirements of Federal law, including the Build America, Buy America Act. • The contractor must ensure that all iron, steel, manufactured products, and construction materials permanently incorporated into the project are produced in the United States, unless a waiver is approved by the Federal awarding agency.

Attached files

Contact

Kourosh Kamali(City Manager)

[email protected]

(301) 985-6585

Key dates

Opened
4/1/2026
Questions due
4/13/2026
Pre-bid meeting
4/6/2026
Closes
4/27/2026
Duration
150 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
BPM056254

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the requirements of the contract. The project involves the construction of a levee trail crossing, which includes demolition, erosion control, and pavement work. The contract will be awarded to the most responsible and responsive bidder, which shall mean, all other things being equal, the contractor proposing the lowest total cost. The budget can be estimated to be in the range of $500,000 to $2,000,000, based on the complexity of the project and the requirements of the contract. The factors that may influence the likely payment range include the cost of materials, labor, and equipment, as well as the contractor's overhead and profit.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 70%

Safe Streets for All (SS4A) Phase 1

Rolling / TBD closeOpened 4/1/2026

City of Cincinnati·Ohio

67% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Seattle·Washington

67% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

County of Stanislaus·California

67% match

Safe Streets and Roads for All Safety Action Plan and Planning Guidelines

Closes 11/19/2026Opened 10/21/2026

City of Charlotte·North Carolina

67% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

City of Watsonville·California

66% match

Safe Streets for All (SS4A) Safety Action Plan

Closes 11/5/2026Opened 10/6/2026

Baltimore County, Maryland·Maryland

66% match

Road Safety Audits: Safe Streets and Roads for All Program (SS4A)

Closes 11/20/2026Opened 10/23/2026

Missouri Department of Transportation·Missouri

65% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Charlotte·North Carolina

65% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Charlotte·North Carolina

65% match

Vision Zero Safe to School: WT Harris at Grier

Rolling / TBD closeOpened 4/1/2026

City of Rancho Cordova·California

65% match

Traffic Safety Action Plan

Closes 11/13/2026Opened 10/9/2026

Hamilton County, IN·Indiana

65% match

Public Safety Training Center Roadway and Levee

Closes 11/8/2026Opened 10/26/2026

Missouri Department of Transportation·Missouri

65% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Seattle·Washington

65% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

City of Ontario·California

65% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Boynton Beach·Florida

65% match

SAFE STREETS 4 ALL SAFETY ACTION PLAN

Closes 11/17/2026Opened 10/21/2026

City and County of San Francisco·California

65% match

EXT MTA | Safe Routes to School Program

Closes 12/4/2026Opened 10/29/2026

Town of Mount Vernon·Maine

65% match

Off-Road Snow Plowing, Shoveling & Dry Hydrant Access - Mount Vernon

Closes 12/4/2026Opened 10/22/2026

City of Columbia·Missouri

65% match

Enginering Services: Highway Safety Manual Analysis of CATSO Intersections and Roadways

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Transportation·Washington

64% match

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Closes 7/22/2028Opened 7/22/2026

City of Charlotte·North Carolina

64% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027