The Leon County School Board is seeking a qualified Construction Manager (CM) to provide full‑construction‑manager‑at‑risk services for the new construction, remodeling, demolition, and site‑work of Raa Middle School. The CM will be responsible for pre‑construction planning, cost estimating, value engineering, bid procurement, contract administration, on‑site supervision, schedule control, change‑order management, and final close‑out, including warranty administration. The role is a phased, performance‑based contract with a Guaranteed Maximum Price (GMP) to be negotiated after design documents are issued.
• Oversee all phases of a K‑12 school build‑out, including new classrooms, gym, media center, outdoor plazas, and utility infrastructure.
• Manage trade‑contract packages, conduct pre‑bid conferences, evaluate sealed bids, and administer contracts under a CM‑at‑Risk model.
• Provide monthly progress reports, CPM schedule updates, cost‑control analysis, and ensure compliance with safety, E‑Verify, drug‑free workplace, and background‑screening requirements.
• Required qualifications: state‑certified contractor, pre‑qualified by the Board, SBE status (optional bonus), and all required certifications (anti‑coercion, contingent‑fee waiver, etc.).
• Submission: seven bound qualification statements due Dec 4 2025, 2 p.m., mail or hand‑delivery only; site visits optional Dec 18 2025‑Jan 9 2026.