This municipal project replaces private‑side lead water service lines with new copper piping along the Harrison‑Cora to Fairmount corridor, and restores associated roadway, driveway, and sidewalk disturbances. The work includes exploratory excavation, trenchless or open‑cut methods, backfill, topsoil placement, seeding, and interior piping modifications where needed. Key points:
• Replace lead service lines (private‑side) with copper pipe, install meters, and perform flushing per AWWA C810.
• Perform excavation, trenchless installation when feasible, and full restoration of concrete/asphalt driveways, sidewalks, and landscaping.
• Contractor must provide 100 % surety for the lead‑line portion, hire a utility locator, and coordinate with GCWW on property‑owner agreements; interior piping work requires a GCWW‑certified person.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.