This rebid project involves a complete interior tenant improvement of a 2,779‑sq‑ft grocery market located on the ground floor of a mixed‑use building. The scope includes demolition, new partitions, finishes, and comprehensive mechanical, electrical, plumbing, and refrigeration upgrades to support a sales floor, checkout area, produce prep, cold storage, and office spaces. The contractor must also handle specialized work such as HVAC duct modifications, fire sprinkler alterations, and installation of refrigerated cases and cooler boxes, all while adhering to prevailing‑wage requirements and a firm bid validity through the end of 2026.
• Interior demolition, framing, drywall, finishes, and floor work for a 2,779 sq ft retail space.
• Full MEP integration: HVAC, plumbing, electrical, fire alarm, and refrigeration systems, including remote defrost controls.
• Specialty trades: concrete scanning, steel infill, roofing patches, metal door hardware, and final construction cleaning.