Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›North Richland Detention Pond Improvements

Mississippi

North Richland Detention Pond Improvements

Closes 10/23/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Richland, Mississippi is seeking a qualified construction contractor to execute the North Richland Detention Pond Improvements. The scope includes mucking existing detention ponds, removing portions of levees, re‑grading for drainage, installing pipe and rip‑rap, and placing and maintaining erosion‑control measures. Bids must be submitted electronically or in person by 10:00 a.m. on October 23, 2026. All bidding documents, addenda, and specifications are available through the designated website, with printed copies obtainable for a non‑refundable deposit. The contract will be awarded to the responsible bidder meeting the qualification criteria and offering the best value. • Scope: earthwork (mucking, levee removal, re‑grading), pipe installation, rip‑rap placement, erosion‑control installation/maintenance. • Location: City of Richland, MS (380 Scarbrough St., Richland, MS 39218). • Bid submission: electronic via www.engserviceplans.com or in‑person at City Hall, deadline Oct 23, 2026 10:00 a.m. local time. • Pre‑bid/site visits: not required; prospective bidders may review documents at the issuing office Mon‑Fri 8 a.m.–5 p.m. • Award: date not specified; contract will be for the construction of the detention pond improvements.

Attached files

Contact

Katie Parker

[email protected]

Key dates

Opened
10/15/2026
Closes
10/23/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
46775

Budget estimate

$500,000 – $1,500,000

Based on typical municipal detention‑pond upgrades in Mississippi, a project of this size (multiple ponds, extensive earthwork, pipe and rip‑rap) would likely fall in the $0.5 million to $1.5 million range. The lower bound reflects a modest scope with minimal pipe work; the upper bound assumes higher volumes of material movement, extensive erosion‑control, and contingency costs. Factors influencing the final amount include site conditions, material prices, and any required design changes during construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virginia Polytechnic Institute and State University·Virginia

Top match · 67%

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

Virginia Polytechnic Institute and State University·Virginia

67% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

S7 KTR, LLC on behalf of Montgomery County Municipal Utility District No. 201·Texas

66% match

Detention Ponds and Mass Grading to Serve Longleaf Development

Closes 11/12/2026Opened 10/23/2026

City of North Charleston·South Carolina

66% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

65% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

Spartanburg School District Five·South Carolina

65% match

Detention Pond and Brush Cutting Services

Closes 11/5/2026Opened 10/20/2026

City of North Charleston·South Carolina

64% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

City of Casper·Wyoming

64% match

GLENDALE DETENTION POND IMPROVEMENTS

Closes 11/6/2026Opened 10/17/2026

Colton Municipal Utility District No. 1·Texas

64% match

Mass Grading and Detention Facilities to Serve Colton Detention Pond A Phase 1

Closes 11/10/2026Opened 10/20/2026

New York City Department of Environmental Protection·New York

63% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Charlotte·North Carolina

63% match

Robert L. Smith Park Pond Surface Water Quality Improvement Project

Rolling / TBD closeOpened 5/29/2026

Town of Church Point·Louisiana

63% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

63% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of Charlotte·North Carolina

62% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Prior Lake·Minnesota

62% match

2026-2027 Pond Maintenance Project

Closes 11/19/2026Opened 10/30/2026

Gwinnett County Government·Georgia

62% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

City of North Charleston·South Carolina

62% match

Northwood Estates Pond Improvements

Closes 11/17/2026Opened 10/2/2026

City of Valdosta·Georgia

62% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026