Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Richards Boulevard Drainage Improvements

City of Sacramento·California

Richards Boulevard Drainage Improvements

Closes 6/3/2026$1.5M – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Sacramento is seeking a qualified contractor to design‑build and construct storm‑drainage improvements along Richards Boulevard between Sequoia Pacific Boulevard and North 5th Street. The work includes installing new drainage pipelines of various diameters, constructing manholes and junction boxes, relocating a PG&E gas‑main, providing traffic control, de‑watering, surface restoration, CCTV inspection, and complying with extensive environmental, safety, and local‑business‑enterprise (LBE) requirements. • Pipe installation: 24‑, 36‑, 42‑ and 54‑inch drainage pipelines totaling ~900 LF. • Utility relocation: trench excavation for PG&E gas‑main (≈380 LF) and utility potholing. • Ancillary work: traffic‑control plan, de‑watering allowance up to $50 K, CCTV inspection of ~983 LF, asphalt concrete paving, and C&D waste‑management reporting. • Contract terms: 10 % bid security, 100 % performance/payment bonds, $1,875 per day liquidated‑damage, 5 % LBE participation, and a 90‑working‑day construction schedule after Notice to Proceed.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tim Moresco(Senior Engineer)

[email protected]

(916) 808-1432

Key dates

Opened
5/13/2026
Questions due
5/20/2026
Closes
6/3/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
B26141311011

Budget estimate

$1,500,000 – $2,000,000

The engineer’s estimate for the project is $1,661,000. Assuming typical municipal construction profit margins of 5‑12 %, the contractor’s net earnings would likely fall between roughly $1.5 million and $2 million. Factors influencing the range include the final negotiated contract price, change‑order scope, allowance utilization (e.g., de‑watering up to $50 K), and any deductions for LBE compliance or waste‑management penalties.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 73%

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

DeSoto Parish Police Jury·Louisiana

70% match

2026 DPPJ Road and Drainage Improvements Cotton Belt

Closes 11/10/2026Opened 10/15/2026

City of Charlotte·North Carolina

70% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

70% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Charlotte·North Carolina

70% match

Louise Ave Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2026

City of Valdosta·Georgia

70% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

City of Charlotte·North Carolina

69% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

City of Easley·South Carolina

69% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

Maryland Baltimore City Department of Public Works·Maryland

69% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

69% match

Fawnbrook Ln (514) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/1/2026

City of Charlotte·North Carolina

69% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Charlotte·North Carolina

68% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Charlotte·North Carolina

68% match

Collective AJ Storm Drainage Improvement Projects

Rolling / TBD closeOpened 3/29/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

68% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 10/23/2026

City of Charlotte·North Carolina

68% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

Sewerage and Water Board of New Orleans·Louisiana

68% match

Drainage Point Repairs

Closes 11/13/2026Opened 10/20/2026

City of Charlotte·North Carolina

68% match

Collective AD Storm Drainage Improvement Program

Rolling / TBD closeOpened 3/15/2026

City of Brandon·Mississippi

68% match

BROOKSTONE PLACE DRAINAGE IMPROVEMENTS

Closes 11/20/2026Opened 10/21/2026

City of Charlotte·North Carolina

68% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of South Miami·Florida

68% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of Charlotte·North Carolina

68% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

The Village of Royal Palm Beach·Florida

68% match

Heron Parkway Drainage Improvements PW1903

Closes 11/10/2026Opened 10/15/2026

City of Charlotte·North Carolina

68% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Charlotte·North Carolina

68% match

Rocky Falls Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2028

City of Oldsmar·Florida

68% match

State Street Drainage Ditch Improvements Project

Closes 11/19/2026Opened 9/25/2026