The Naval Facilities Engineering Systems Command, Mid-Atlantic is seeking manufacturers of electric galley appliances that are compatible with current Insinger and Vulcan appliances for installation at Naval Station Great Lakes, IL. The project involves replacing galley steam equipment in the Building 7122 USS Pearl Harbor Processing Day BEQ at Camp Moffett, Naval Station Great Lakes. The existing system consists of two Cleaver-Brooks 1.38 Mbtu/hr each 25 psi steam boilers servicing the B-7122 P-Day barracks galley and are approaching failure. The agency requires the procurement and installation of electric galley equipment to ensure operational continuity and safety.
• Replace galley steam equipment with electric powered equipment
• Remove the steam boiler system and replace antiquated steam utilizing galley service equipment and systems
• Install electric galley equipment, including dishwashers, pot and pan washers, and steam kettles
• Ensure compatibility with current Insinger and Vulcan appliances
• Ensure operational continuity and safety
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.