The Bureau of Land Management (BLM) is seeking a contractor to replace the MBIC boiler. The new boiler must meet the most recent LEED efficiencies and standards, and it shall be a high-efficiency condensing type suitable for commercial/institutional application. The contractor will be responsible for procurement, delivery, installation, startup, and commissioning of the new boiler. The Period of Performance for this requirement will be from March 1, 2026, through May 1, 2026.
• The contractor must ensure that the new boiler meets or exceeds the minimum efficiency requirements of ASHRAE Standard 90.1.
• The contractor must perform required testing and balance, startup, verification of functionality, and confirmation of proper heating system and controls performance in the presence of the Government engineer.
• The contractor must coordinate with the Contracting Officer and MBIC personnel to schedule site visits.
• The contractor must provide equipment with a minimum thermal efficiency of 90% or greater, with higher efficiencies (95%+ typical of condensing systems) preferred to align with LEED v5’s emphasis on operational carbon reduction and optimized energy performance.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.