Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Relocation of Sewer Lines

City of Austin·Texas

Relocation of Sewer Lines

Closes 2/25/2026$100k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Austin is seeking a contractor to provide all-inclusive plumbing services to reroute existing private sewer lines to meet up with new City sewer connections for two adjacent residential properties. The contractor will be responsible for providing a site visit, coordinating permits and inspections, and maintaining site safety and traffic control. The project requires the installation of two new individual sewer lines, one for each lot, at a depth of approximately 3-6 feet to provide gravity drainage. The contractor must also ensure that all private sewer lines are installed to proper grade to eliminate standing water and provide continuous gravity flow. • The contractor must be a licensed Master Plumber in the State of Texas. • The contractor must provide all-inclusive pricing covering the full scope of work. • The contractor must obtain and close out all required permits and inspections. • The contractor must coordinate work sequencing to minimize disruption to residents and public right-of-way. • The contractor must maintain continuous site safety and traffic control as required. • The contractor must protect existing utilities, structures, and landscaping. • The contractor must install private sewer connections in the following approximate configurations: 1602 Houston Street: 2-inch private sewer connection, approximately 32 linear feet; 1604 Houston Street: 6-inch private sewer connection, approximately 20 linear feet. • The contractor must install City-approved sewer cleanouts for each service at approximately three to six feet in depth, located for accessibility and maintenance. • The contractor must permanently cap both existing private sewer lines downstream of the new connections once rerouting is complete. • The contractor must perform abandonments in accordance with City of Austin plumbing and utility requirements. • The contractor must comply with all City of Austin heritage tree protection requirements. • The contractor must implement protective measures to prevent damage to the tree and surrounding root system. • The contractor must remove and replace any affected concrete panels, including the driveway crossing at 1602 Houston Street. • The contractor must restore all disturbed areas, including pavement, concrete, soil, and landscaping, to equal or better conditions than existed prior to construction. • The contractor must provide and maintain all required safety measures, barricades, signage, and traffic control in accordance with City of Austin and OSHA requirements. • The contractor must maintain a clean, safe, and orderly job site at all times. • The contractor must schedule and pass all required inspections. • The contractor must perform testing as required to verify proper installation and functionality. • The contractor must correct, at no additional cost to the City, any deficiencies identified during inspections. • The contractor must provide a minimum one-year warranty on workmanship unless otherwise required by City standards.

Attached files

Contact

Kimberley Thoene(Authorized Contact)

[email protected]

(512) 972-0360

Key dates

Opened
2/17/2026
Closes
2/25/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
IFQ 2200 KJT1041

Budget estimate

$100,000 – $500,000

The budget for this contract is estimated to be between $100,000 and $500,000, based on the scope of work and the requirements for the project. The contractor will need to provide all-inclusive pricing covering the full scope of work, which includes the installation of two new individual sewer lines, permits, inspections, and site safety and traffic control. The cost of materials, labor, and equipment will also need to be factored into the pricing. The City of Austin may also require additional services, such as testing and inspections, which could increase the overall cost of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Thomas·Oklahoma

Top match · 79%

City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

Hastings Utilities·Nebraska

76% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

Georgia City of Lagrange·Georgia

74% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

City of Cincinnati - Purchasing Division·Ohio

72% match

De Votie Avenue Sewer Replacement - Phase 2A

Closes 11/25/2026Opened 10/28/2026

Town of Andrews·South Carolina

70% match

Cherry Street Sewer Upgrade

Closes 11/13/2026Opened 10/14/2026

City of Findlay·Ohio

70% match

North Town Sanitary Sewer Replacement

Closes 11/12/2026Opened 10/28/2026

City of Minneapolis·Minnesota

70% match

BID-PW-Private Water and Sewer Svc Relocation 2027

Closes 11/3/2026Opened 10/16/2026

City of Lynchburg·Virginia

69% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

City of Ponca·Oklahoma

69% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

City of South San Francisco·California

69% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/12/2026Opened 10/1/2026

City of Douglas·Wyoming

69% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Northeast Ohio Regional Sewer District·Ohio

69% match

CSO-203 Relocation

Closes 11/10/2026Opened 10/6/2026

City of Cleveland·Ohio

68% match

120-26 - Constructing & Installing Replacement Sewers & Repairing & Rehabilitation of Existing Sewers

Closes 12/2/2026Opened 10/29/2026

Erie County·New York

68% match

ERIE COUNTY SEWER DISTRICT NO. 1 FRENCH ROAD AT RANDY WAY SANITARY SEWER REPLACEMENT CONTRACT NO. 52

Closes 11/17/2026Opened 10/13/2026

City of Elgin·Illinois

68% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

City of Elgin·Illinois

68% match

Chicago Street Combined Sewer Separation Project

Closes 11/5/2026Opened 10/8/2026

City of Opa-locka·Florida

68% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026

Sewerage and Water Board of New Orleans·Louisiana

68% match

Drainage Point Repairs

Closes 11/13/2026Opened 10/20/2026

U.S. Department Of Defense·Missouri

68% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Catawba Regional Council of Governments·South Carolina

68% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

New York City Department of Design and Construction·New York

67% match

Emergency Sewer Work

Rolling / TBD closeOpened 4/24/2025

City of Cincinnati·Ohio

67% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

Fort Bend County Municipal Utility District No. 134A·Texas

67% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026

St. Bernard Parish Government·Louisiana

67% match

Daniel Drive Sewer Repairs and Rehabilitation, St. Bernard Parish Government

Closes 11/5/2026Opened 9/21/2026

City of Thomas·Oklahoma

67% match

City of Thomas Public Water Improvement - Relocation of Public Water Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026