Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Water and Wastewater
  5. ›RFQP Centrifuge Polymer for Wastewater Division

City of Bakersfield·California

RFQP Centrifuge Polymer for Wastewater Division

Closes 6/3/2026$400k – $900kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Bakersfield Water Department is seeking a qualified supplier to provide bulk centrifuge polymer on an on‑call basis for its Wastewater Treatment Plant 3. Suppliers must first pre‑qualify their polymer through on‑site jar‑testing and a two‑day centrifuge trial, demonstrating at least 22 % cake solids and 95 % capture efficiency. Once pre‑qualified, the contractor will deliver approximately 3,500 gal per month, off‑load and pump the product into the plant’s storage tank, and provide monthly technical service and a Certificate of Analysis. The contract is a two‑year base term, renewable up to three additional one‑year extensions at the City’s option, with a fixed price subject to limited CPI adjustments. Evaluation will be based on the lowest annual polymer cost calculated from trial performance and the submitted price. • Pre‑qualification trial required (April 22 – May 20 2026). • Bulk polymer delivery ≈ 3,500 gal/mo, on‑call, Mon‑Fri 7:00 a.m.–3:30 p.m. • Fixed‑price contract, 2‑year base term, renewable up to 5 years total; award expected June 24 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jesus Banuelos(Engineer II)

[email protected]

(661) 326-3723

Key dates

Opened
4/15/2026
Closes
6/3/2026
Projected award
6/24/2026
Duration
2 years

Last updated

Details

Type
Request for Proposal
Industry
Water Management and Sanitation
NAICS
325199
Solicitation №
N/A

Budget estimate

$400,000 – $900,000

The contract will cover the supply of roughly 3,500 gal of polymer each month. Assuming a market price of $5‑$12 per gallon (typical for specialty wastewater polymers) the annual spend ranges from about $210,000 to $500,000. Over the base two‑year term the total contract value would be approximately $420,000‑$1,000,000, with potential additional revenue from service calls and certificates of analysis. Therefore a realistic earnings estimate for the supplier is $400K‑$900K for the full contract period.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Bismarck·North Dakota

Top match · 71%

Wastewater Treatment Plant Polymer IFB

Closes 11/3/2026Opened 8/11/2026

City of Baltimore·Maryland

70% match

Polymeric Flocculant

Closes 1/7/2030Opened 1/7/2025

U.S. Department Of Defense·Texas

68% match

PUMP, CENTRIFUGAL, COOLANT

Closes 11/4/2026Opened 10/21/2026

Massachusetts City of Haverhill·Massachusetts

68% match

Centrifuge Conveyor Replacement at the Haverhill Wastewater Division Process Building

Closes 11/6/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

67% match

PUMP UNIT,CENTRIFUG

Closes 11/12/2026Opened 10/28/2026

City of Charlotte·North Carolina

66% match

Water Treatment Polymer Trials

Rolling / TBD closeOpened 7/1/2026

U.S. Department Of Defense·United States of America

66% match

PUMP UNIT,CENTRIFUG

Closes 11/16/2026Opened 10/19/2026

Connecticut Town of Stafford·Connecticut

65% match

RFQ: On-Call Engineering Services for Wastewater-Related Needs

Closes 11/17/2026Opened 10/28/2026

U.S. Department Of Energy·Ohio

65% match

TECHNOLOGY LICENSING OPPORTUNITY: PBI High-Temperature Hollow Fiber Membranes

Closes 12/4/2026Opened 6/5/2026

City of Montpelier·Vermont

65% match

Wastewater Collection Suction Lift Pump Systems

Closes 11/26/2026Opened 10/28/2026

El Paso Water·Texas

65% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

City of Woodland·California

64% match

FOR THE SUPPLY OF ALUMINUM-BASED COAGULANTS AND POLYMERS FOR WASTEWATER TREATMENT

Closes 11/12/2026Opened 10/22/2026

El Paso Water·Texas

64% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

Maryland Environmental Service - Procurement Division·Maryland

64% match

Furnish and Delivery of Liquid Emulsion Polymer at MD Correctional Institute WWTP - SBR Procurement

Closes 11/16/2026Opened 10/17/2026

El Paso Water·Texas

64% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

Washington Suburban Sanitary Commission, MD·Maryland

64% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

64% match

43--IMPELLER,PUMP,CENTRIFU

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

64% match

41--FAN ASSEMBLY,CENTRIFUG

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Maryland

64% match

W912DR26X1B2N

Closes 1/8/2027Opened 1/8/2026

Massachusetts Town of Lee·Massachusetts

64% match

IFB ZetaLyte 294CH Dry Polymer

Closes 11/12/2026Opened 10/7/2026

City of Idaho Falls·Idaho

64% match

Water Division Inventory Replenishment

Closes 11/2/2026Opened 10/13/2026

City of Montpelier·Vermont

64% match

Wastewater Collection System – Suction Lift Pump Station Equipment Preselection

Closes 12/3/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

64% match

43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/28/2026

El Paso Water·Texas

64% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 12/2/2026Opened 9/20/2026

Massachusetts Department of Correction·Massachusetts

64% match

19-DOC-9006-Wastewater Chemicals and Supplies

Closes 12/1/2028Opened 6/18/2025