The City of Charleston is seeking bids for the Central Park Drainage Improvements Project. The project involves improving the drainage and tidal and flood resiliency in the Central Park Road basin on James Island by installing improvements along an approximate 4,250 LF corridor of open channel with upfits at multiple culvert crossings. The work will include demolition and removal of asphalt roadways, concrete sidewalks, concrete curb and gutter, rip-rap, trees, and storm drain pipe, culverts, and structures; installation of new storm drain pipe, culverts, valves, and structures; grading along the open channel to establish positive drainage; water main and sanitary sewer force main relocations; installation of asphalt paving, concrete sidewalks, and concrete curb and gutter; installation of temporary and permanent erosion control, including rip-rap; traffic control; surveyed as-built record drawings; and more as shown in the Drawings.
• The project is funded in part by the South Carolina Rural Infrastructure Authority (RIA).
• The City of Charleston's standard contract for this procurement is attached to this solicitation.
• The successful Bidder and all subcontractors will be required to obtain a business license from the City of Charleston prior to beginning work.
• The Contractor shall perform the contract in accordance with the representations made in the Small Business Enterprise Compliance Provisions.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.