W.M. Schultz Construction, Inc. (Schultz), bidding as a prime contractor, welcomes quotes from all qualified subcontractors, services, material suppliers and trucking firms for complete or portions of the work for the following project:
Harris Sewer District Forcemain and Pump Station Replacement – Phase 1
Town of Thompson, Sullivan County, NY
NOTE: SCHULTZ IS ACTIVELY SEEKING AND ENCOURAGING CERTIFIED MBE/WBE/SDVOB's TO SUBMIT QUOTATIONS ON THIS PROJECT
Summary of Work:
Replace two existing sewer pump stations at separate locations and install approximately 5,000 linear feet of 4" PVC sewer force main between the two new pump stations. Includes site work and new driveway entrances at pump stations and restoration for force main installation. Two (2) complete fully operational sewage pumping system (Harris Pump Station and Old Route 17) and 4” force main. Furnish and install all labor, material, and equipment for the 4” SDR 26 PVC Sewage Forcemain and 8” gravity main connections, including but not limited to, temporary bypass pumping to maintain sewage flows, excavation, disposal, bedding, pipe, fittings, couplings, air release valves, manholes, cleanouts, valve boxes, caps, risers, frames, covers, spools, cutting, grouting, miscellaneous concrete, backfill and compaction, restoration, & testing. Jack and Bore work related to the proposed sewage force main including but not limited to excavation, directional drilling, shoring, steel sleeve, boring and jacking, backfill, compaction, shoring removal, and restoration of surfaces.
Contractors are required to provide proof of registration with NYSDOL as required by Labor Law Section 220-I.
Link to our secure project folder, containing all current project documents: Harris Sewer District Forcemain and Pump Station Replacement – Phase 1- Bid Docs
Minority / Women Business Enterprise contracting goals (MWBE)
MBE Goal: 10.00%
WBE Goal: 10.00%