The City of San Antonio is seeking a qualified contractor to remove existing HVAC equipment and install two new 4‑ton Daikin mini‑split systems at Fire Station No. 3. The scope includes supplying and installing two condensers (48,000 BTU total), running new copper refrigerant lines, electrical wiring, and condensate drainage, performing start‑up and testing, and removing an existing shop heater with gas‑line capping. Any required structural modifications must be minimized and repaired. The work must be completed with minimal disruption to the fire station’s operations.
• Install two 4‑ton Daikin mini‑split systems (condensers and indoor handlers)
• Run copper refrigerant lines, electrical circuits, and condensate drains
• Perform system start‑up, testing, and verification of full functionality
• Remove existing shop heater and safely cap the gas line
• Perform limited structural modifications and restore cut surfaces where needed
• Deliver all work by the September 30, 2026 deadline; pre‑bid conference on Sep 21 (optional) and site visit on Sep 22.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.