Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Oregon
  4. ›Construction
  5. ›Flood Reduction Resiliency Levee Improvements - Schedule A

City of Reedsport, Oregon·Oregon

Flood Reduction Resiliency Levee Improvements - Schedule A

Closes 8/18/2026$4.5M – $5.3MInvitation for BidLogin requiredFee to access
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This project involves comprehensive flood mitigation and levee upgrades in Reedsport, Oregon. The work includes constructing a sand trench and sand berm at Champion Park using owner‑furnished sand, removing and replacing four levee gatewell structures with new piping and valves, importing approximately 21,000 cubic yards of earthen fill to raise the existing levee, and installing roughly 500 linear feet of 36‑inch high‑density polyethylene pipe to enclose an existing open ditch toward the Elm Street Pump Station. An optional additive bid alternate covers improvements to the 16th Avenue Pump Station. The contract is subject to Davis‑Bacon prevailing‑wage requirements, Oregon Prevailing Wage Law, Buy America provisions, and grant compliance with the Oregon Department of Emergency Management Hazard Mitigation Assistance Grant Program. The anticipated project duration is 180 days and the estimated base bid ranges from $3.7 M to $4.3 M with an additive alternate of $0.85 M to $0.99 M. • Construct sand trench and berm using owner‑supplied sand. • Replace four gatewell structures, associated piping, and valves. • Import and place ~21,000 yd³ of earthen fill to raise the levee. • Install ~500 ft of 36‑in HDPE pipe and related infrastructure. • Optional additive work for 16th Avenue Pump Station improvements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

La Grande Office(Soliciting Agent)

[email protected]

(541) 963-8309

Key dates

Opened
7/23/2026
Pre-bid meeting
8/4/2026
Closes
8/18/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
Quest Number: 10281114

Budget estimate

$4,550,000 – $5,290,000

The solicitation lists a base bid estimate of $3.7 M–$4.3 M plus an additive alternate of $0.85 M–$0.99 M, yielding a total projected contract value between roughly $4.55 M and $5.29 M. Considering the scope—extensive earthwork, sand berm construction, gate‑well replacement, and HDPE pipe installation—the estimate aligns with similar civil‑engineering flood‑mitigation contracts in the Pacific Northwest, which typically fall in the $4–6 M range. Therefore, a reasonable budget estimate is $4.5 M to $5.3 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department of Homeland Security - FEMA·United States of America

Top match · 72%

Fiscal Year 2024 Flood Mitigation Assistance

Rolling / TBD closeOpened 1/6/2025

U.S. Department of Homeland Security - FEMA·United States of America

72% match

Fiscal Year 2024 Flood Mitigation Assistance Swift Current

Closes 12/30/2026Opened 5/30/2024

U.S. Department of Homeland Security - FEMA·United States of America

71% match

Fiscal Year 2026 Flood Mitigation Assistance Swift Current

Closes 1/31/2028Opened 7/14/2026

Sterling Heights·Michigan

71% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

U.S. Department Of Defense·Louisiana

70% match

CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R

Closes 11/13/2026Opened 10/19/2026

U.S. Department of Homeland Security - FEMA·United States of America

70% match

Fiscal Year 2026 Flood Mitigation Assistance

Closes 2/26/2027Opened 10/22/2026

City of Cedar Rapids·Iowa

70% match

Ellis Blvd NW Levee and Floodwall Improvements

Closes 11/18/2026Opened 10/21/2026

Agency of Digital Services·Vermont

70% match

ANR DEC Flood Resiliency Training

Closes 11/6/2026Opened 9/22/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Manatee County - Purchasing Division·Florida

69% match

MUSGRAVE RANCH ROAD FLOODPLAIN COMPENSATION

Closes 11/20/2026Opened 10/15/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of Defense·Missouri

69% match

Levee Repair at MRLS L246

Closes 5/28/2027Opened 5/28/2026

Municipality of Skagway·Alaska

69% match

West Creek Levee Improvements

Closes 11/9/2026Opened 10/12/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of Defense·Missouri

69% match

Levee Repairs at Saline County Levee District #2, Ray-Carroll Bottoms Consolidated Levee District of Carroll County, and Howard County Levee District #4

Closes 2/5/2027Opened 11/26/2025

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Assumption Parish Police Jury·Louisiana

69% match

Request for Qualifications: Engineering and Planning Services for Amelia Levee – Bayou Boeuf Project (TE-0192)

Closes 11/2/2026Opened 10/6/2026

California Grants·California

69% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

U.S. Department Of The Interior·Utah

69% match

F--Post-Flood Cleanup and Disaster AbatementSand Is

Closes 11/4/2026Opened 10/30/2026

Illinois Emergency Management Agency·Illinois

69% match

FFY 2022 Flood Mitigation Assistance

Rolling / TBD closeOpened 5/1/2026

Department of Buildings and General Services VT·Vermont

69% match

ANR DEC Flood Resiliency Training Bidder Response Form Addendum 1 Addendum 2

Closes 11/6/2026Opened 9/22/2026

U.S. Department Of Defense·Missouri

69% match

Corning and Holt 10 Levee Repairs

Closes 7/21/2027Opened 7/21/2026

North Lafourche Conservation, Levee and Drainage District·Louisiana

68% match

Reach 1 Site Preparation Project - Morganza To the Gulf Risk Reduction System

Closes 12/3/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

68% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026