Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›CARMENITA ROAD REHABILITATION PROJECT FROM 550’ NORTH OF…

City of Norwalk·California

CARMENITA ROAD REHABILITATION PROJECT FROM 550’ NORTH OF EXCELSIOR DRIVE TO ROSECRANS AVENUE CIP 7184

Closes 7/29/2026$2.5M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Norwalk is soliciting bids for a comprehensive rehabilitation of Carmenita Road (approximately 550 ft north of Excelsior Drive to Rosecrans Avenue). The contract includes full‑depth asphalt removal, concrete sidewalk and curb‑gutter reconstruction, utility adjustments, drainage upgrades, retaining wall construction, traffic‑control and striping, and associated civil‑engineering services. The work must be completed within the seasonal construction window (May 1 – Sept 30 2026) and within 100 working days after the second Notice‑to‑Proceed, with strict liquidated‑damage penalties for schedule overruns. • Asphalt milling, base and surface placement, plus ARAM interlayer installation. • New PCC sidewalks, curb‑gutter, curb ramps, and a CMU retaining wall. • Utility relocations (water, sewer, storm, electrical, telecom) and ITS loop installations. • Drainage improvements, cross‑gutter replacement, and traffic‑control plan development. • Full compliance with Federal‑aid requirements (Buy‑America, Davis‑Bacon prevailing‑wage, DBE participation).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Isiah Corona

[email protected]

(562) 929-5778

Key dates

Opened
6/29/2026
Questions due
7/10/2026
Closes
7/29/2026
Duration
100 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
IFB No. 26-867

Budget estimate

$2,500,000 – $3,000,000

The solicitation budgets the project at roughly $2.7 million. Assuming the contractor’s net profit margin typical for public‑works projects (5‑10 %), the expected earnings would fall between about $135,000 and $270,000. However, the total contract revenue (the amount the contractor will be paid) is expected to be near the budgeted $2.5‑$2.9 million range, depending on final measured quantities and any change orders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The City of Anaheim·California

Top match · 71%

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

California Department of Transportation·California

70% match

Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.

Closes 11/17/2026Opened 9/28/2026

San Bernardino County·California

70% match

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026Opened 10/27/2026

City of Toledo·Ohio

70% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

California Department of Transportation·California

69% match

Reconstruct roadway and drainage system, & construct ADA facilities.

Closes 12/9/2026Opened 10/26/2026

City of Toledo·Ohio

69% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

City of Rancho Cordova·California

69% match

Rancho Cordova Complete Streets Implementation Guide

Closes 11/13/2026Opened 10/9/2026

City of Santa Ana·California

69% match

Industrial Street Repair Program (Wilshire & Wright)

Closes 11/18/2026Opened 10/30/2026

City of Corning·California

69% match

Yolo Street Rehabilitation Project

Closes 11/4/2026Opened 9/23/2026

City of Morgan Hill·California

69% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

California Department of Transportation·California

68% match

RHMA (Gap Graded), cold plane AC Pvmt, HFST, Mod signals & lighting.

Closes 11/10/2026Opened 10/5/2026

City of Hermosa Beach·California

68% match

CIP 106 - Annual Street Improvements Project

Closes 12/9/2026Opened 10/29/2026

California Department of Transportation·California

68% match

Multi-asset, pavement rehab, & off-ramp widening at Artesia Blvd.

Closes 11/10/2026Opened 9/21/2026

City of Rancho Palos Verdes·California

68% match

Miraleste Traffic Calming Measures, CIP No. 8858

Closes 11/20/2026Opened 10/27/2026

City of Lancaster·Texas

68% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

68% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

City of Coronado·California

68% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

California Department of Transportation·California

68% match

Slab replacement, RHMA paving, modify signal and lighting systems.

Closes 12/1/2026Opened 10/5/2026

Nevada Government·Nevada

67% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Modoc County Road Department·California

67% match

FOR CONSTRUCTION OF MODOC COUNTY ROAD 1 REHABILITATION PROJECT FROM THE INTERSECTION OF COUNTY ROAD 9 TO THE B.L.M. BOUNDARY

Closes 11/12/2026Opened 10/1/2026

City of Laguna Hills·California

67% match

Citywide Pavement Rehabilitation, CIP 101-M

Closes 12/1/2026Opened 10/29/2026

City of Carrollton·Texas

67% match

Josey-Parker Intersection Improvements

Closes 11/5/2026Opened 10/15/2026

City of Elk Grove·California

67% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

67% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT CITY-PARISH PROJECT No. 24-EN-HC-0025

Closes 11/17/2026Opened 10/16/2026

City of Culver City·California

67% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026