The Tennessee Department of Environment and Conservation is seeking a qualified contractor to perform comprehensive road‑improvement work at Montgomery Bell State Park. The scope includes demolition of existing stone headwalls and signage, reconstruction of the headwall with salvaged stone, installation of a 24‑inch HDPE slip liner in the culvert, concrete curb installation, new asphalt pavement construction, milling and overlay of existing roadway, riprap drainage installation, and associated signage and utility protection. All work must be completed by mid‑October 2026 and delivered to the park site.
• Demolition, excavation, and rebuilding of a stone headwall and culvert rehabilitation.
• Installation of approximately 2,002 sq ft of new asphalt, 4,582 sq ft of milling/overlay, and 75 ft of concrete curb.
• Construction of riprap‑lined drainage, directional signage, and associated site‑work (utility protection, traffic control, and clean‑up).
• Contractor must hold a valid Tennessee building contractor license (BC‑B, BC‑B(sm), BC‑C, HRA, HRA‑B, or HRA‑E), provide required insurance, bonds, and tax registration, and may not assign the contract without prior written approval.