Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Civil Engineering
  5. ›Ticonderoga (T) Chilson/Eagle Lake Well Source Development…

NYS Essex County·New York

Ticonderoga (T) Chilson/Eagle Lake Well Source Development New District RFQ for Engineering Services

Closes 3/6/2026$500k – $2MRequest for QualificationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Ticonderoga seeks qualifications for New York State licensed professional engineering firms or licensed engineering teams to prepare design services through Construction regarding the Well Source Development Project for the residents of Chilson/Eagle Lake area. The Town of Ticonderoga is currently operating the Gooseneck Pond water source under a Filtration Avoidance Criteria from the New York State Department of Health (NYSDOH) and the United States Environmental Protection Agency (EPA). The Town of Ticonderoga is required to discontinue the Gooseneck Pond water source as a drinking water source. The Town of Ticonderoga has traditionally obtained drinking water from two water sources owned and licensed by the Town of Ticonderoga, Gooseneck Pond and Lake George. The Chilson-Eagle Lake area currently gets their drinking and fire flow water from Gooseneck Pond but is not currently within a formal district. The Chilson-Eagle Lake area is geographically separated by terrain from the hamlet of the Town of Ticonderoga (former Village of Ticonderoga). In 2021 The Town of Ticonderoga hired Barton & Loguidice, (B&L) to complete a Map, Plan and Report for the proposed Chilson-Eagle Lake Water District. In 2023, AES Northeast submitted a preliminary engineering report listing the project on the Annual Intended Use Plan with NYS EFC. The requested professional services are to update the Map, plan and report, and preliminary engineering necessary for the revised scope of work for the project. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: none Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 20.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 0.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Derrick Fleury(Technical Contact)

(518) 585-7855

Key dates

Opened
2/17/2026
Closes
3/6/2026

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541330
Solicitation №
n/a

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work, which involves preparing design services through construction for the Well Source Development Project. The total budget may range from $500,000 to $2,000,000, considering the complexity of the project and the need for professional engineering services. The factors that may influence the likely payment range include the size of the Chilson-Eagle Lake area, the number of residents served, and the requirements for the new well source.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

South Tahoe Public Utility District·California

Top match · 71%

Engineering Services for Tanglewood and Sunset Well Control Buildings and Infrastructure Design

Closes 11/13/2026Opened 9/21/2026

City of Casper·Wyoming

70% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

Imperial Irrigation District·California

69% match

East Highline Reservoir Project

Closes 12/2/2026Opened 9/10/2026

County of Moore·North Carolina

68% match

Engineering Services - East Moore Water District Phase 5 Water Main Extension

Closes 11/12/2026Opened 10/22/2026

Cuyahoga County·Ohio

68% match

RQ16425: Highland Road Bridge Engineering Services

Closes 11/5/2026Opened 10/5/2026

City of Casper·Wyoming

68% match

GLENDALE DETENTION POND IMPROVEMENTS

Closes 11/6/2026Opened 10/17/2026

Ohio Department of Natural Resources·Ohio

67% match

ODNR, Division of Oil & Gas – OWP – Federal Project –Seneca 5F - 14 Wells

Closes 11/5/2026Opened 10/7/2026

Wyoming State Construction Department·Wyoming

67% match

Engineering Services - Buffalo Bill State Park Parkwide Asphalt Pavement Rehabilitation Project - Dept. of State Parks

Closes 11/4/2026Opened 10/1/2026

City of Fargo·North Dakota

67% match

City of Fargo RFP - Engineering Services: Project No. SR-28-A0 Project No. SN-28-A0 Project No. SN-29-A0

Closes 11/13/2026Opened 10/17/2026

Connecticut City of Meriden·Connecticut

67% match

Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

City of Laredo·Texas

67% match

FY27-ENG-007 - Recreational Trails Grant Program 2022 Shiloh Bike Trails – Emergency Towers and Bike Repair Stations - Engineering Department

Closes 11/6/2026Opened 10/22/2026

NYS Alden, Town of·New York

67% match

Townline Water District

Closes 11/4/2026Opened 10/9/2026

Chittenden County Regional Planning Commission·Vermont

67% match

Ongoing Call: RFQ TO MUNICIPALITIES & ORGANIZATIONS TO SERVE AS WATER QUALITY IMPROV

Closes 12/31/2026Opened 7/18/2022

U.S. Department Of Defense·California

67% match

Coyote Valley Dam (CVD) Lake Mendocino Sewage and Septic Services

Closes 11/9/2026Opened 10/28/2026

Village of Cary·Illinois

67% match

RFQ-P Well No. 4 and WTP Phase II and III Engineering Services 11.20.26

Closes 11/6/2026Opened 10/20/2026

Confederated Tribes of the Colville Reservation·Washington

67% match

Environmental Trust, Comprehensive Emergency Management Plan Update & Environmental Engineering and Consulting Services

Closes 11/5/2026Opened 10/19/2026

City of Waco·Texas

67% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

U.S. Department Of The Interior·Utah

67% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

Kansas Department of Wildlife and Parks·Kansas

67% match

Pratt Water System Improvements

Closes 11/10/2026Opened 10/12/2026

Town of Bennington·Vermont

66% match

TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559

Closes 11/19/2026Opened 10/6/2026

NYSERDA·New York

66% match

Engineering Services for the West Valley Site Management Program

Closes 12/3/2026Opened 10/30/2026

NYS Dutchess County Water and Wastewater Authority·New York

66% match

Quaker Hill Water-Hyde Park Interconnection-Storage Tank-Design Services

Closes 11/25/2026Opened 10/20/2026

Connecticut Town of Naugatuck·Connecticut

66% match

FY27-B142

Closes 2/26/2027Opened 10/7/2026

Ohio Department of Natural Resources·Ohio

66% match

ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells

Closes 11/19/2026Opened 10/23/2026

City of Dublin·Ohio

66% match

Abbreviated Summer 2026 Consultant Services Bulletin

Rolling / TBD closeOpened 5/28/2026