The Federal Bureau of Prisons (FBOP) is seeking a contractor to repair the Glycol Loop Exchanger at the Metropolitan Correctional Complex (MCC) Chicago, located in Chicago, Illinois. The project consists of furnishing all equipment, materials, and labor for the complete repair to the existing Hybrid Fluid Cooler, 2 Pumps with VFDs, and pipework installed throughout the 27-story high-rise to feed 14 heat pump cooling units. The contractor will be required to attend a pre-work meeting to coordinate and plan with the on-site staff prior to the day of work. The project must comply with local, state, and federal regulations.
• The project consists of repairing the Glycol Loop Exchanger, which includes two exchangers with small seam leaks.
• The contractor must furnish all equipment, materials, and labor for the complete repair.
• The project must comply with local, state, and federal regulations.
• The contractor will be required to attend a pre-work meeting to coordinate and plan with the on-site staff.
• The project is a 100 percent small business set-aside, and the contractor must be registered in the System for Award Management (SAM) as a small business.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.