Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›Public Safety Complex Upgrades Handicap Access Sidewalk…

Town of Waterford·Connecticut

Public Safety Complex Upgrades Handicap Access Sidewalk Improvements Main Entry

Closes 3/17/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Waterford is seeking proposals from qualified contractors to remove existing bricks, concrete curbing, and sidewalks to construct a handicap accessible sidewalk located inside the Public Safety Complex, in front of the Waterford Police Station. The project includes mobilization and project closeout, sedimentation control systems, maintenance and protection of traffic, selective demolition, pavement saw cutting, bituminous pavement removal, concrete sidewalk removal, concrete curbing removal, bituminous curbing removal, HMA S0.5 bituminous concrete, HMA S0.375 bituminous concrete, concrete sidewalk, concrete parking area, concrete sidewalk ramp, precast concrete curbing, install handicap parking signs, pavement striping, marking and symbols, handrail installation, and remove and replace sidewalk bollard lighting. The contractor must provide all necessary tools, apparatus, and implements, freight, cartage, and expense, and do all the work and furnish all the materials necessary in the manner and upon the conditions specified. • The project requires the contractor to commence work on or before a date to be specified in a written Notice to Proceed and to fully complete the project within 90 consecutive calendar days thereafter. • The contractor must pay as liquidated damages the sum of $1,000 for each consecutive calendar day thereafter. • The contractor must provide satisfactory bonds and insurance as required by the General Conditions, the Information for Bidders, and the Supplementary Conditions. • The contractor must execute a formal contract with the Town of Waterford for the fulfillment of this proposal within 30 days after notice of the award.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Gary Schneider

[email protected]

(186) 044-4586

Key dates

Opened
2/13/2026
Questions due
3/2/2026
Pre-bid meeting
2/19/2026
Closes
3/17/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
IFB# 26-002

Budget estimate

$200,000 – $500,000

The budget for this project is estimated to be between $200,000 and $500,000, based on the scope of work and the materials required. The project involves the removal of existing bricks, concrete curbing, and sidewalks, and the construction of a new handicap accessible sidewalk, which may require significant labor and materials costs. However, without more detailed information on the specific requirements and quantities of materials, it is difficult to provide a more precise estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Westwood·Massachusetts

Top match · 72%

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of Richmond Government·Virginia

70% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Virginia Department of Transportation·Virginia

70% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Georgia City of College Park·Georgia

69% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

Idaho Transportation Department·Idaho

69% match

Key No. 23883 2ND STREET S SAFETY IMPROVEMENTS

Closes 11/3/2026Opened 10/10/2026

U.S. Department Of Transportation·Hawaii

69% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

Illinois Tollway·Illinois

69% match

I-26-2059 - Plaza Improvements

Closes 11/13/2026Opened 10/3/2026

Maryland State Highway Administration·Maryland

69% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

Virginia Department of Transportation·Virginia

68% match

B36_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

NYS East Fishkill, Town of·New York

68% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Cerritos·California

68% match

CDBG-Funded curb ramp/sidewalk repairs at Cerritos Towne Center Phase IV (CDBG Project No. 602800-26), Project No. 24302

Closes 11/18/2026Opened 10/23/2026

City of Ormond Beach - Purchasing Office·Florida

68% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

City of Columbus – Department of Finance and Management·Ohio

68% match

Public Safety Facilities Structural Remediation – 2077 Parkwood & 724 E Woodrow

Closes 11/6/2026Opened 10/19/2026

Maryland State Highway Administration·Maryland

68% match

PGA435176 - MD 414 (St. Barnabas Road) from IS 95 Ramp 2 to MD 5 Ramp 5 Safety

Closes 12/3/2026Opened 10/27/2026

NYS Rochester, City of·New York

68% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

Maryland State Highway Administration·Maryland

68% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

U.S. Department Of State·United States of America

68% match

Sliding Gate Safety Deficiencies Remediation

Closes 12/31/2026Opened 7/16/2026

City of San Diego·California

68% match

Gompers Prep 47th St Safety Enhancement

Closes 11/19/2026Opened 10/20/2026