Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Ohio
  4. ›Construction
  5. ›Public Safety Facilities Structural Remediation – 2077…

City of Columbus – Department of Finance and Management·Ohio

Public Safety Facilities Structural Remediation – 2077 Parkwood & 724 E Woodrow

Closes in 5 days$800k – $2.2MInvitation for BidLogin required
Get bids like this by emailBid source

Description

This solicitation calls for the complete structural remediation of two City‑owned public‑safety facilities – the CPD Property Room at 724 E Woodrow Ave and the CPD Warehouse/Office at 2077 Parkwood Ave. Work includes removal and replacement of undersized steel lintels, extensive CMU masonry repair and tuck‑pointing, concrete sidewalk‑cap repair, site drainage improvements, and associated temporary shoring, protection, and coordination with existing mechanical and security systems. Bidders must submit an electronic bid via BidExpress, provide a 10 % bid bond, and comply with Ohio prevailing‑wage, insurance, and background‑check requirements. The contract will be awarded to a single prime contractor; no subcontractor pre‑qualification is required because the estimated contract value is under $2 M. • Replace defective steel lintel over the overhead‑door opening at 724 E Woodrow and install new galvanized W8×31 lintel with required bearing and stud details. • Perform CMU block replacement, mortar‑joint tuck‑pointing, and corrosion protection for steel lintels at both sites, including the south wall of the Parkwood building and the west wall openings. • Repair spalled concrete sidewalk caps above the retaining wall, regrade site soil for positive drainage, and provide temporary shoring/needle beams while work is performed. • Coordinate removal, storage, and re‑installation of overhead‑door hardware and lighting, and complete all required documentation (insurance, bid bond, performance bond, and contract‑compliance number) before the Notice to Proceed.

Attached files

Contact

Christopher Long(Director)

[email protected]

(614) 645‑8200

Key dates

Opened
10/19/2026
Questions due
11/2/2026
Pre-bid meeting
10/26/2026Mandatory
Site visit
11/2/2026
Closes
11/6/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
RFQ033899

Budget estimate

$800,000 – $2,200,000

The contract is described as a “public‑safety facilities remediation” with an estimated value under $2 M (the solicitation explicitly notes that pre‑qualification is not required because the contract is expected to be below that threshold). Assuming a typical municipal profit margin of 5‑10 % and accounting for the required 10 % bid bond, the net earnings for the prime contractor are likely to fall between roughly $800 k and $2.2 M, depending on the final awarded amount, the scope of alternates exercised, and any change‑order work that may arise during construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Columbus·Ohio

Top match · 91%

Safety Facilities Remediation-2077 Parkwood / 743 E Woodrow

Closes 11/4/2026Opened 10/19/2026

The City of Columbus·Ohio

91% match

RFQ033899 - Safety Facilities Remediation-2077 Parkwood / 743 E Woodrow

Closes 11/4/2026Opened 10/20/2026

Ohio Department of Rehabilitation and Correction·Ohio

82% match

McKinley Ave Roof-DRC270104-714

Closes 11/4/2026Opened 10/20/2026

City of Greer·South Carolina

81% match

Re-Solicitation: Century Park Field 1 Fence Replacement

Closes 11/17/2026Opened 10/31/2026

City of Ontario·Oregon

80% match

Ontario City Hall Fencing and Parking Lot Upgrade Project

Closes 12/17/2026Opened 10/27/2026

City of Cincinnati·Ohio

80% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/6/2026Opened 9/10/2026

Lucas County, OH Facility Management·Ohio

80% match

CIP 26-012 Jail Subsurface Water Remediation – Basement Water Remediation at Lucas County Correction Center

Closes 11/12/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

80% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

NYS OGS Design & Construction - Construction Contractors·New York

80% match

Rehabilitate Floodwalls – Project 46196‑C (Cheektowaga, NY)

Closes 11/18/2026Opened 10/13/2026

City of Greer·South Carolina

80% match

Re-Solicitation: Century Park Field 1 Fence Replacement

Closes 11/17/2026Opened 10/30/2026

Medina County, OH Sanitary Engineering·Ohio

80% match

Chatham Water Tower Rehabilitation 2027

Closes 11/6/2026Opened 10/16/2026

Maryland Baltimore City Recreation and Parks·Maryland

80% match

RP23888 Latrobe Park Longhouse Restoration

Closes 12/2/2026Opened 10/29/2026

Collin County, TX·Texas

79% match

Construction, CCSO Subsurface Water Intrusion

Closes 12/3/2026Opened 10/20/2026

Oregon City of Springfield·Oregon

79% match

CITY HALL SOUTH STAIRS CONCRETE REPAIR

Closes 11/3/2026Opened 10/5/2026

City of Salina·Kansas

79% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/15/2026

Massachusetts City of Salem·Massachusetts

79% match

27-22-PRCS Forest River Park Bathroom Renovation

Closes 11/9/2026Opened 10/14/2026

City of Appleton, WI·Wisconsin

79% match

GG-26 Resealing Concrete Light Poles and Bollards

Closes 11/9/2026Opened 10/23/2026

Charleston·South Carolina

79% match

26-B025R Rehabilitation of 182 Congress Street

Closes 12/2/2026Opened 10/30/2026

City of Toledo·Ohio

79% match

Roof Repairs and Replacement

Closes 11/17/2026Opened 10/30/2026

The City of Columbus·Ohio

79% match

RFQ033962 - Berliner Lighting Emergency Improvements

Closes 11/4/2026Opened 6/27/2023

North Texas Tollway Authority·Texas

79% match

RFB 06209 Plano Operations Center Exterior Rehabilitation

Closes 11/5/2026Opened 10/9/2026

Ohio Adjutant General’s Department·Ohio

79% match

BLDG 105 Pump House Windows

Closes 11/12/2026Opened 10/28/2026

City of Hays·Kansas

79% match

Bickle Schmidt Sports Complex Poured-In-Place Surfacing

Closes 11/3/2026Opened 10/15/2026

Ohio Department of Natural Resources·Ohio

79% match

PWC Dillon State Park Asphalt Patching

Closes 11/5/2026Opened 10/16/2026

Maryland Baltimore City Department of Public Works·Maryland

79% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026