Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Construction
  5. ›Brigham Road Water and Sewer Replacements

North Carolina Orange Water & Sewer Authority·North Carolina

Brigham Road Water and Sewer Replacements

Closes 10/20/2026$2M – $4MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Orange Water & Sewer Authority is soliciting sealed bids for the complete replacement of water and sanitary sewer mains along Brigham Road in Carrboro, NC. The work includes removal and replacement of approximately 560 ft of 8‑in. AC water main (to be replaced with 370 ft of 8‑in. ductile iron and 150 ft of 2‑in. PVC), replacement of 1,480 ft of sanitary sewer main (325 ft of 16‑in. ductile iron and 1,170 ft of 16‑in. PVC), installation of new manholes, and associated pavement, curb, gutter, and appurtenance work. Bids are to be submitted as a single prime unit‑price general construction contract, with a mandatory pre‑bid conference on September 30, 2026 and a bid deadline of October 20, 2026. The contractor must hold appropriate NC General Contractor licenses and provide a 5 % bid deposit (cash or bond). Substantial completion is required within 180 calendar days of the Notice to Proceed, and final completion within 210 days. • Scope: Water main (8‑in.) and sewer main (16‑in.) replacement, manhole construction, pavement & curb work. • Lengths: ~560 ft water, ~1,480 ft sewer. • Materials: Ductile iron, PVC, associated fittings, meters, and appurtenances. • Contract type: Single‑prime unit‑price construction contract (sealed bid). • Mandatory pre‑bid meeting: 30 Sep 2026, 2 PM, Carrboro admin office. • Bid deadline: 20 Oct 2026, 2 PM. • Licensing: NC General Contractor license required. • Performance security: 5 % bid deposit (cash or bid bond). • Schedule: 180 days to substantial completion, 210 days to final completion. • Contact for documents/questions: Sam Tracy, Engineer ([email protected]).

Attached files

Contact

Sam Tracy(Engineer)

[email protected]

Key dates

Opened
9/15/2026
Pre-bid meeting
9/30/2026Mandatory
Closes
10/20/2026
Duration
210 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
460-375-01 and 276-61

Budget estimate

$2,000,000 – $4,000,000

Based on typical unit‑price rates for ductile‑iron and PVC water/sewer pipe installation in North Carolina (approximately $150–$250 per linear foot for water pipe and $120–$200 per linear foot for sewer pipe, plus additional costs for manholes, pavement, and appurtenances), the total bid value is likely to fall between $2 million and $4 million. The lower bound assumes minimal ancillary work and lower material costs; the upper bound reflects higher labor rates, extensive pavement restoration, and the inclusion of all required appurtenances.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Agriculture·Utah

Top match · 71%

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

Hastings Utilities·Nebraska

69% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

City of Findlay·Ohio

69% match

North Town Sanitary Sewer Replacement

Closes 11/12/2026Opened 10/28/2026

City of Fargo·North Dakota

69% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Georgia City of Lagrange·Georgia

69% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

City of Saint Peter·Minnesota

69% match

Saint Peter, City of 2026 Lead Service Line Replacement BMI No. 26X.142592

Closes 11/13/2026Opened 10/16/2026

Western Virginia Water Authority·Virginia

68% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

Town of Chase City·Virginia

68% match

Sanitary Sewer Rehabilitation

Closes 12/9/2026Opened 10/29/2026

City of Ketchikan·Alaska

68% match

26-21 Water Street Sewer Improvements Phase B - Hopkins Alley to Front Street

Closes 11/20/2026Opened 10/30/2026

Clermont County - Board of Commissioners·Ohio

68% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

James City County·Virginia

68% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

Bossier Parish Police Jury·Louisiana

68% match

Goodwill Road at Highway 80 – Well #29 (Well #23 Replacement) – Consolidated Waterworks/Sewerage District No. 1

Closes 11/5/2026Opened 10/7/2026

Hastings Utilities·Nebraska

68% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Oregon Tualatin Valley Water District·Oregon

67% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

Delaware County Regional Sewer District·Ohio

67% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

Minnesota Department of Administration·Minnesota

67% match

Douglas Lodge Area Water & Sewer Replacement

Closes 11/19/2026Opened 10/15/2026

City of Douglas·Wyoming

67% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Edgewater, FL·Florida

67% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Massachusetts Town of Plymouth·Massachusetts

67% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

Town of Andrews·South Carolina

67% match

Cherry Street Sewer Upgrade

Closes 11/13/2026Opened 10/14/2026

City of Augusta, GA (Augusta Commission)·Georgia

67% match

Cook Road Waterline Replacement

Closes 11/30/2026Opened 10/29/2026

Fort Bend County Municipal Utility District No. 252·Texas

67% match

Water and Drainage Facilities , & Paving and Appurtenances to Serve Wild Oak Collector Road with Offsite Sanitary Sewer Alternate

Closes 11/5/2026Opened 10/14/2026

City of Alhambra·California

67% match

N2M26-94 SEWER MAIN REPLACEMENT PROJECT ON SIERRA VISTA AVENUE

Closes 11/5/2026Opened 10/8/2026

City of Lake City and City of Bellechester·Minnesota

66% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026